Laserfiche WebLink
WORK AUTHORIZATION DIRECTIVE <br />No. 2017-007 <br />Pelican Pointe Water Service Lateral Replacement <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: June 6, 2017 <br />ATTACHMENT 2 <br />EFFECTIVE DATE: June 20, 2017 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE.REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: Oaks of Vero Water Service Replacement <br />COUNTY UTILITY PROJECT NO.: UCP #NIA CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. 47123536-044699-017528 <br />You are directed to proceed promptly with the following work: <br />Description: Replace water meter boxes and service lateral piping. <br />Attachments: Attachment 1 <br />Method of determining Contract Price: <br />❑ Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />❑ Lump Sum <br />0 Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) _ <br />$14;_581.71 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCE <br />By: <br />Blue Goose Construction <br />Labor Con acto/ <br />Date: l <br />RECOMMENDED: <br />By: / �.� <br />John M. Boy, , P.E. <br />Utilitties Engineer <br />Date: <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Joseph E. Flescher <br />Date: <br />F:Wtlllties\UTILITY- Engineering\Projects -Utility Construction Permlts\IRC - Oaks of Vero WS Replacement\Admin\Agenda Item\Work <br />Authorization No. 2017-007.doc <br />P104 <br />