Laserfiche WebLink
Docket No. 170077 -EQ <br />Date: June 29, 2017 <br />FLORIDA PONVERB LIGHT COMPANY <br />(Continual from Sheet No. 9.()30) <br />Attachment A <br />Page 3 of 42 <br />Rri Second Revised Sheet No. 9.031 <br />Cancels'ArWmA Firsi Shect No. 9.031 <br />I. QS Facility <br />The QS contemplates, installing operating and maintaining a <br />KVA generating facility located <br />at (hereinafter called the "Facility"). The Facility is designed to <br />produce a maximum of kiloa acts ("MY) ofcicctric power at an 85% lagging to 1351A leading poster factor.The <br />Facility's.location and generation capabilities are as described in the table below. <br />TECHNOLOGY AND GENERATOR CAPAI)I.LITIES <br />Location: Specific legal description (e.g., metes and bounds or other legal C <br />description with street address required) Coouu <br />nt): <br />Generator Type (Induction or Synchronous) <br />Type of Facility (Hydrogen produced from sources otlter than fossil fuels, biomass <br />as defined in Section 25-11.210 (2) F.A.C. , solar energy, geothermal energy, wind <br />energy, ocean energy, hydroelectric poster, waste heat from sulfuric acid <br />manufacturing operations: or <IOOKW cogenerator) <br />Technology <br />Fuel Type and Source <br />Generator Rating (KV A) <br />Maximum Capability (K%N) <br />Alinimum Load <br />Peaking Capabilin <br />Net Output (KW) <br />Power Factor M <br />Operating Voltage (kV) <br />Peak Internal Load KW <br />The following sections (a) through (c) are applicable to Renewable Energy Facilities ("RGFs") and section (fig) is only <br />applicable to Qualifying Facilities with it design capacity of 100 KW or less: <br />(a) If the QS is a REF, the QS represents and ssamnts that (i;) the sole sources) of fuel or power used by the Facility <br />to produce energy for sale to FPL during the term of dtis Contract shall be such sources as are defined in and <br />provided for pursuant to Sections 36691(2) (a) and (b), Florida Statutes, and FPSC Rules 25-17.210(1) and (2), <br />F.A.C.: (ii) Fossil fuels shall be limited to the minimum quantities necessary for start-up, shut -down and fur <br />operating stability at minimum load: and (_iii) the REF is capable ofgcncrating the amount of capacity pdrsnant to <br />Section 5 of this Agreement stithout the use of fossil fuels. <br />(b) The Parties agree and acknowledge that if the QS is a REF, the QS will not charge for, and FPL shall have o <br />obligation to pay for, any electrical energy produced by the facilitt� front 'a source of fuel or power except ans <br />specifically provided fur in paragraph I(u) above. <br />(Continued on Sheet No. 9.032), <br />Effective:. SeptemheF 0; 20 M <br />1j;, �,�)4 <br />