My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2017
CBCC
>
Meetings
>
2010's
>
2017
>
07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:07:56 PM
Creation date
9/14/2017 10:28:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docket No. 170077 -EQ <br />Date: June 29, 2017 <br />FLORIDA POWER & LIGHT COMPANY <br />(Conlinucd (inn Shucl No. 9.031) <br />-Teoflt i tenth Revised Sheet No. 9.032 <br />CancelsNlnfhl'enth Revised Sheet No. 9.032 <br />(c) 1f the QS is a REF, the QS shall, on an annual Iasis and within thirty (30) days:flier theanniversary dale of this ContMO <br />and on an annual basis thereafter for the term of Ws Contract. deliver to FPL a report certified by an officer of the QS: <br />(i) slating, the t)Pc and amount of each source of fuel or power used by die QS to produce energy daring the heclve <br />month period prior to the anniversary date (Ute "Contract Year'): and (ii) verifying that one hundred percent(1000 rj of <br />all energy sold by the QS to f•TL during the Contract Year complies with Sections 1(a) and (1t) of this Contract. <br />(d) If the QS is a RV1:, the QS rprsents and wmrrants that the Facility erects the renewable energy requirements of Section <br />366.91(2Xi) and (h). Florida Slatutcs, and FPSC Rules 25-17.210(1) and (2).. F.A.C.. and that the QS stall continue to <br />meet such rquiremenU throughout the Icon of this Contract. FPL shall have the richt at all times to'inspial Uro Facility <br />and to usmnine any pontis, records. or other documenis, of the QS that FPL deans neccss m, to verify that the Facility <br />Inerts smith requirements. <br />(c) 'the Facility (i) has been certified or has selkertified as a "qualifying facility" pursuant to the Rqulatiuns of the Federal <br />Energy Regulator• Commission ("FERC"} or (ii) has been certified by the FMC as it "qualifying facility" pursuant la <br />Rule 25-17,0q 1), A QS dial is a qualit}ing facility- with a design capacih of less than 100 KW shall maintain enc <br />"qualifyirrt status' of Use Facility fhmuglmut Ilio temh of this Contruci.-I-111, shall love Ute rigid at all times to inspW <br />Ute Facility and f , eaamihte any books and records or other documents of the Facility that FPL deems necess try to verily <br />the Facility's qualifying status. On or before March 31 of each year during dna tern of this Contract. Ute QS shall <br />provide to lTl. a certificate Signed by an otlicer of the QS certifying that the Facility has continuously maintained <br />qualifying status, <br />2. TermofContract <br />Except as otherwise provided herein, this Contract shall become effective inunediitely upon its execution by the 'Panics into <br />"Flfective DaW) and slndl have the termimdon date seams it Appen ix E. unless terininalcd cailier in accordance with lite provisions <br />hercnl'. Notwithstanding the forceoing. if the Capacity' Ikliyery Date (as defined in Secfion S,5) ofthe Facility is not accomplished by the <br />QS before hoc 1.24-24-2O22 or such Iat4r date as may be termitted by FPL liursuant to Section 3 of this Contract. 177111. will he permitted <br />to terminate this Contract consistent with the iemhs herein without further obligations. duties or liability to the QS, <br />Minimum Specifications <br />Following arc the minimmn sfecifcations pertaining to this Contract: <br />L 11te avoided unit ("Avoided Unit") on which thisContract is based is detailed in Appendix A- <br />1 11 is oftir shall expire on Aphil I.2x t 201 —q- <br />3. 11tc date Im which firm capacity and enctgy deliveries from the QS to FPI, %hill continence is the in-service date of the <br />Avoided Unit (or such later tLtte ns may be l+crtnitted by .ITI, pursuant to Scctinn S of this commei) unless the QS chooses a capacity <br />fe,Y tient option that provides for early calmeity payments purstiant to the Mans of this Contract, <br />1. the period of lime over which limn capacity and energy ,shall he delivered trait the QS to F111. is a s1weitied in <br />Appendix E:.provided-such itcriod shall he no less than a minimum often (10) rears alter the in-service date of lite Avoided Unit <br />5. The following are die mihinum pcnfonnance standards for die delivery of firm capacity and energy by. the QS to qukrlfly <br />far fill caivacity payments under this Contract; <br />On Peak <br />Avuilabililv 94.016 <br />All Hours <br />94.0 <br />QS Performance and (.)it Peak hours shall he as measured andtor de:crihed in I"I Us Rate Schedule QS -2 attached lento as Appendix A <br />(Continued on Sheet No. 9.0;2.1) <br />Issued by: S. E. Romig, Director, Rates and Tstriffs <br />Effective: GTA -*-44,.40" <br />Attachment A <br />Page 4 of 42 <br />ggnhi <br />
The URL can be used to link to this page
Your browser does not support the video tag.