Docket No. 170077 -EQ
<br />Date: June 29, 2017
<br />FLORIDA POWER & LI(;1 f COMPANY
<br />(Continued from Sheet )1o. 9.032)
<br />3.2 QS, at no cost to FPL, shall be responsible to:
<br />Attachment A
<br />Page 5 of 42
<br />First Revised Shed No. 9.032.1
<br />Cancels Original Shed No. 9.032.1
<br />3.2.1 Des�g4 construct, and maintain the Facility in accordance with this Contract, applicable law, regulatory, and
<br />governmental approvals, any requirements of warranty agreements or similar agreements, prudent industry practice,
<br />insurance policies, and fire Interconnection Agreement or Wheeling Agreement.
<br />3.22 Perform all studies, pay all fees, obtain all necessary approvals and execute all necessary agreements (including
<br />the Interconnection Agreement or the Whoelmg Ag oment(s)) in order to schedule and ddiver the firm capacity and
<br />energy to FPL.
<br />32.3 Obtain and maintain all permits, cer"Icatioas, licaises, consents or approvals of -Y governments] of regulatory
<br />authority necessary for the constriction, operation, and maintenance ofthe Facility (the "Permits"} QS shall keep FPL
<br />reasonably informed as to the status of its permitting efforts and shall promptly inform FPL of any Permits it is unable to
<br />obtain, that are delayed, limited, susperdel, terminated, or otherwise constrained in a way dot could limit, reduce,
<br />interfere with; or preclude QS's ability to perform its obligations Under this Contract (including a statement of wiiethei and
<br />to what extent this circumstance may limit or prechde QS's ability to perform under this Contract.)
<br />3.2A Demonstrate to PPL's reasonable satisfaction that QS has established Site Control, an agreement for the
<br />ownership or lease ofthe Facility's site, for the Term of The Contract.
<br />3.2.5 Complete all environmental impact studies and comply with applicable eavizomawial laws necessary for the
<br />construction, operation, and maintenance ofthe Facility.
<br />3.26 At FPL's request, provide to FPL electrical specifications and design drawings pertaining to the Facility
<br />for FPL's review prior to faializing design of the Facility and before beginning construction work based on such
<br />specifications and dmwhugs, provided M's review of such specifications and design shell not be construed as endorsing
<br />the specification, and design thereof, or as any express or implied warranties iuchding perfommantce, safety, durability or
<br />reliability ofthe Facility. QS shall provide to FPL reasonable advance notice of any changes in the Facility and provide
<br />to FPL specifications and design drawings of any such changes.
<br />32.7 Within fill= (1 S) days ager the close of each month from the first month following the Effective Date until the
<br />Capacity Delivery Date, provide to FPL a monthly progress report (in a form reasonably satisfactory to FPL) and agree to
<br />regularly scheduled modings bet%%= representatives ofQS and FPL to review such monthly reports and discuss QS's
<br />construction progress. Rhe Monthly Progress Report shall indicate wiretherQS is on target to meds the Capacity Delivery
<br />Date. If,,forany reason, FPL has reason to believe that QS may fail to achieve the Capacity Delivery Date, then, Upon
<br />FPL's rogoesl, QS shall submit to FPL, within len (10) business days of such request a remedial action plan ("Remedial
<br />Action Plan") that sets forth a detailed description of QS's proposed course of action to promptly achieve the Capacity
<br />Delivery Date. Delivery of a Remedial Action Plan does not relieve QS of its obligation to meet the Capacity Delivery
<br />Data
<br />33 FPL shall have the right, but not the obligation, to:
<br />3.3.1 Inspect during business hours upon reasonable notice, or obtain copies of all Permits held by QS.
<br />3.32 Consistent with Section 3.2.6. nobly QS in writing ofthe tesuhs of the review within thirty (30) days of FPL's
<br />receipt ofall specifications for the Facility, including a description ofany flaws perceived by FPL in the design.
<br />3.3.3 Inspect the Facility's construction site or on-site QS data and information pertaining to the Facility during
<br />business hours upon reasonable notice.
<br />(Continued on Shed110.9.033)
<br />Issued by: & L Rondg, Director, Rates and Tariffs
<br />Effective: Septeanber 13, 2016
<br />-10-