Laserfiche WebLink
Docket No. 170077 -EQ <br />Date: June 29, 2017 <br />PWXWA rUWXK ee LAie[r LUMrANT <br />(Continued Gum ShedNo.10.315) <br />UL FUELSUPPLY <br />,7neel 11%G. I V.JIO <br />Attachment A <br />Page 39 of 42 <br />• Describe all fuels to be used to generate electricity at the Facility. Indicate the specific physeal and chemical characteristics <br />of each fuel type (e g, Btu content, sulfur content, ash content, etc.) Identify special considerations regarding fuel supply <br />origin, source and handling, storage and processing requirements. <br />• Provide annual fuel requirements (AFR) necessary to support the ,pursuant to Section 366.41, Florida Statutes, <br />and the planned levels of generation and list the assumptions used to determine these quataities. <br />• Provide a summary of Ore status of the fuel supply arrangements in ptace to fined the ARFR in each year of the proposed <br />operating fife of the Facility. Use the categories below to describe the cunt arrangement for seeming the AFR. <br />Category <br />Description of Fud Supply Arrangement fuel is from a fully developed <br />owned = <br />source owned by one or more 'of the project participants <br />contract = <br />fully executed rum fuel contract exists between the developer($) and fuel supplier(s) <br />LOI = <br />a letter of intent for the fuel supply exists between developers) and fuel supplier(s) <br />REF = <br />renewable energy facility will bum biomass, waste, or another renewable re�urrx <br />spot = <br />fuel supply will be purchased on the spm marled <br />none: <br />no faro lud supply errangementumently in place <br />Giber <br />fuel supply arrangement which does not fit any of the above categories (please describe) <br />• Indicate the percentage of the Facility's APR which is covered by the above fuel supply imangement(s) for each proposed <br />operating year. The percent of AFR covered for each operating year must total 100% For fuel supply arrangemetrts identified <br />as owned, contract or LOI, provide documentation to support this category and explain the fuel price mechanism of the <br />arrangement. in addition, indicate whether or not the fuel price includes delivery and, if so, to what location. <br />• Describe fuel transportation networks available for delivering all primary and secondary fuel to the Facility site. Indicate the <br />mode, route and distance of each segment of the journey, front fuel source to the Energy Facility site. Discuss the current <br />status and pertinent factors impacting future availability of the transportation netwoilc <br />• Provide amoral -fuel transportation requirements (AFTR) necessary to support planned levels of generation and list the <br />assumptions used to determine these quantities. <br />• Provide a sruronary of the status of Ore fuel transportation arrangements in place to med the AFTR in each year of the <br />proposed opeuting life of the Energy Facility. Use the categories below to describe the current arrangement for securing the <br />AFTR <br />owned = fuel transport via a fully developed system owned by one or more of the project participants <br />contract = fully executed firm transportation contract exists bet%vm the developer(s) and fuel tnamsportcrs) <br />LOI = a lelterof intent for rite] transport exists between developers) and fuel transporter(s) <br />spot= fuel uansponation will be purchased on the spot market <br />none = to firm fuel transportation arrangement currently in place <br />other= fuel transportation arrangement which does not fit any oftheabove categories(pk'asedesenU) <br />• Indicate the percentage of the, Facility's AFR which is covered by the above fud supply arrangements) for each proposed <br />operating year. The percent of AFR coverod for each operating year must total 100% For fuel supply arrangements identified <br />as owned, contract, or LOI, provide documentation to support this category and explain the transportation price meebenisn of <br />the arrangement. <br />• Provide the maximum, minimum, and average fleet inventory levels to maintained for primary and secondary fuels at the <br />Facility site. List the assumptions used in determining the inventory levels. <br />(Continued an Sheet No. 10317) <br />Issued by: S. L Romig, Director, Rates and Tariffs <br />Effective: May 22,2W <br />-44- <br />l.3-100 <br />