Laserfiche WebLink
Page 3 of 3 <br />must apply to the MOT situation during construction. <br />■ A contractor stated that if Index #600 would not apply, they would need <br />to obtain a plan signed and sealed by a P.E. (Registered Professional <br />Engineer). <br />■ Richard Szpyrka stated a signed and sealed plan is not necessary for this <br />project. <br />■ Nathan Ottoson stated the Contractor needs to be specific with the time <br />and the appropriate index during construction and be aware if it changes. <br />• A Contractor pointed out that the project will be constructed while school is in session. <br />o Nathan Ottoson stated that was correct (school will be in session at start of <br />construction). <br />• Question: Will there be limited working hours because of school being in session? <br />■ Nathan Ottoson stated he did not believe there were any limitations but <br />the time is specified in the contract and he would research it and a <br />response would be provided after this meeting (Follow -Up Response: <br />Working hours will be in accordance with the Contract Documents, <br />Section 00800, Supplementary Conditions, SC -6.02) <br />• Question: Will the County or Contractor arrange for testing? <br />o Nathan Ottoson stated the County will arrange for testing. <br />• Meeting adjourned at approximately 10:08 a.m. <br />ATTACHED: <br />Sign In Sheet <br />1= `.f'u1z1i tl or6ali:; �Gl �H-H! 1(i ;)iVIS1()N PR0Ji:t;'W 17,i 5 C;o-r_ine Bu; To i` (9Uth venu6,'-AdrttiT `,Aleetin s' I-, t.. GoLine Pre - <br />11 2ol7062R'uKC-t%I5 11re [lid ltinnt.cs lttn-2r-2;�17.iioc <br />