• <br /> TASK 2.0- PROJECT QUALITY MANAGEMENT <br /> Activities performed under this task consist of those generally administrative functions required to <br /> maintain the project on schedule,within budget, and that the quality of the work products defined <br /> within this scope is consistent with CONSULTANT's standards. <br /> Task 2.0 is amended to include the specific activities identified below: <br /> Subtask 2.1 Project Update Meetings- CONSULTANT's project manager will prepare for and <br /> attend a kickoff meeting and status meetings throughout the life of the project.It is <br /> estimated that meetings will be held on the average of once a month. <br /> Subtask 2.2 Quality Technical Review- CONSULTANT maintains a quality management system <br /> (QMS) on all of its projects.A Project Quality Management Workshop will be held at <br /> initiation of the project. One formal quality technical review/technical specialist <br /> review meeting has been budgeted for and will be conducted at the 90 percent <br /> completion stage of the project. SWDD's representatives will be invited to attend <br /> and participate at the TRC meetings. <br /> Deliverables produced for the quality technical review/technical specialist review meeting will be <br /> as follows: <br /> • 90 Percent-Complete set of Contract Documents (drawings and technical <br /> specifications) including two hard copies and an electronic PDF. <br /> In addition,technical specialist reviews will be performed on the technical <br /> memorandums included in this Work Order. <br /> Subtask 2.3 Final Design Review- CONSULTANT will prepare and submit a complete set of <br /> Contract Documents (drawings and technical specifications) to SWDD for review at <br /> the 100 percent(final) completion stage.CONSULTANT will incorporate SWDD's <br /> written comments,prepare the final Contract Documents,and submit two hard <br /> copies and a PDF copy of the design drawings and technical specifications to the <br /> SWDD.The technical specifications will also be provided in Microsoft Word format <br /> for review. <br /> Deliverables: <br /> • Contract Documents (Issued for Bid) -two hard copies and an electronic PDF <br /> TASK 3.0- FINAL DESIGN,DRAWINGS,SPECIFICATIONS,AND OPINION OF PROBABLE <br /> CONSTRUCTION COST PREPARATION <br /> This task consists of performing final design and developing Contract Documents (drawings and <br /> specifications) in accordance with the design requirements set forth in Chapter 62-701, F.A.C.,to <br /> procure and construct the project. <br /> Subtask 3.1 Liner,Leachate Collection System,and Force Main Design-Segment 3 Cell 2 is <br /> designed and permitted with a double-liner system consisting of a primary and <br /> secondary high-density polyethylene (HDPE) geomembrane.The design of the liner <br /> system is based on the results of foundation settlement and stability analysis and <br /> meets the requirements of Chapter 62-701.400,F.A.C.A geosynthetic clay liner <br />