My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-147
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 1:19:57 PM
Creation date
10/6/2017 1:19:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/03/2017
Control Number
2017-147
Agenda Item Number
15.B.3.
Entity Name
CDM Smith
Subject
Segment 3 Expansion
Segment 2 Partial Closure and Landfill Gas System Expansion
Area
Design Permitting and Bidding Svs
Alternate Name
Amendment No. 1 to Work Order No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(GCL) with a hydraulic conductivity of 10-7 cm/sec or less will be specified below the <br /> secondary geomembrane liner. Calculations will be performed to specify a <br /> geocomposite capable of handling the flow and load conditions. <br /> A primary leachate collection and removal system above the primary geomembrane <br /> is designed to limit the leachate head less than 12-inches above the liner as required <br /> by Chapter 62-701, F.A.C.A leak detection system will be designed between the <br /> primary and secondary liners.The leachate collection system piping was previously <br /> sized and permitted. CONSULTANT will confirm these calculations.The leachate <br /> collection and conveyance systems will be designed to handle additional loads due <br /> to increase in density of the waste (i.e. achieve the 0.3 percent minimum post- <br /> settlement slope requirement of Chapter 62-701.400, F.A.C.). <br /> The SWDD has requested that Cell 2 gravity drain to a manhole,which is a <br /> modification of the permitted sump pump design. In addition, SWDD has requested <br /> that a new lift station and force main be designed to handle the flows from existing <br /> Segment 3 Cell 1 and future Cells 2-4.CONSULTANT will recommend the location <br /> for the new lift station and perform the required calculations to confirm the size of <br /> the lift station and force main. In addition,CONSULTANT will design the electrical <br /> connections and control panels for the lift station. <br /> In addition,per SWDD's request to divert stormwater flow,CONSULTANT will <br /> design a headwall to be installed behind the existing Segment 1 &2 lift station <br /> (located at NW corner of Segment 2). Details for the headwall will be included in the <br /> drawings in Subtask 2.8. <br /> Subtask 3.2 Closure Subbase Grading- CONSULTANT will utilize the latest topographic survey <br /> information obtained in Phase Ito prepare the grading plan.CONSULTANT will <br /> evaluate overfills and underfills using an AutoCAD Civil 3D model and prepare grade <br /> differentials comparing the topographic survey to the permitted final closure <br /> grades.The subbase grading will help determine the tie-in of the new partial closure <br /> grading to the existing closed grades. CONSULTANT will notify SWDD if any design <br /> considerations need to be made for the over/underfills. <br /> Subtask 3.3 Stormwater Management System Design-CONSULTANT will review the <br /> permitted stormwater management system including overall swale sizing,letdown <br /> pipe locations and sizes,terrace swales,structures at terrace details,flashboard <br /> risers,and control structures and incorporate into the design drawings.Work <br /> includes verification of the design ICPR model to confirm parameters and results. <br /> Subtask 3.4 Final Cover System Design-CONSULTANT will design the final cover system in <br /> accordance with 62-701.600, F.A.C.The available geomembrane materials and <br /> geocomposites will be evaluated to prepare the design of the final cover system. <br /> The design will include the required details for geomembrane boots for gas wells, <br /> cleanouts,sideslope risers,and other penetrating components,geomembrane edge <br /> markers,and tie-ins to the existing bottom liner system and existing cap liner <br /> system.The permit set details will be utilized and additional details will be added as <br /> necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.