My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-147
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 1:19:57 PM
Creation date
10/6/2017 1:19:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/03/2017
Control Number
2017-147
Agenda Item Number
15.B.3.
Entity Name
CDM Smith
Subject
Segment 3 Expansion
Segment 2 Partial Closure and Landfill Gas System Expansion
Area
Design Permitting and Bidding Svs
Alternate Name
Amendment No. 1 to Work Order No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 3.5 Landfill Access Road -CONSULTANT will design an extension to the landfill access <br /> road on Segment 2.CONSULTANT will work with SWDD to determine the preferred <br /> access road route. Design will include review of stormwater collection and stability <br /> for the road. Design details will be developed and incorporated into the drawings. <br /> Subtask 3.6 Landfill Gas System Expansion- Prior to commencing the design drawings, <br /> CONSULTANT will evaluate the existing LFG well pumping system and air system to <br /> determine its functionality and any required improvements.CONSULTANT will <br /> make a site visit and coordinate with the SWDD and their LFG system operator as <br /> needed for LFG system monitoring and operations data.CONSULTANT will <br /> incorporate the improvements into the LFG drawings. <br /> SWDD has requested that the CONSULTANT evaluate the need for flare <br /> upgrades/rehabilitation.CONSULTANT will make a site visit and review the flare as- <br /> builts and operations and maintenance manual to determine the required <br /> rehabilitation. <br /> Subtask 3.7 Design Drawing Preparation- CONSULTANT will prepare detailed contract <br /> drawings for the construction of the proposed Segment 3 Cell 2 expansion,Segment <br /> 2 Partial Closure,and LFG system expansion.CONSULTANT will include <br /> incorporating the construction permit conditions into the drawings prior to award <br /> of contract. Below is a preliminary list of drawings required for the construction of <br /> this project: <br /> Sheet No. Title <br /> General <br /> Cover <br /> G-1 Index,Location Map,General Notes <br /> G-2 Symbols and Legend <br /> G-3 Abbreviations <br /> G-4 Site Aerial/Contractor Staging Area/Construction Trailer Area/Limits of <br /> Construction <br /> Civil <br /> C-1 Segment 3 Cell 2 Site Survey Information/Existing Conditions/Boring <br /> Locations/Horizontal Control Plan <br /> C-2 Segment 3 Cell 2 Demolition Plan <br /> C-3 Segment 3 Cell 2 Top of Processed Sand Grading Plan <br /> C-4 Segment 3 Cell 2 Leachate Piping System Plan <br /> C-5 Segment 3 Cell 2 Force Main Plan <br /> C-6 Segment 3 Cell 2 Cross Section and Profile <br /> C-7 Segment 3 Cell 2 LDS Sump Plan <br /> C-8 Segment 2 Site Survey Information/Existing Conditions/Boring Locations/ <br /> Horizontal Control Plan <br /> C-9 Segment 2 Cover Grading and Stormwater Control System Plan <br /> C-10 Segment 2 Gas System Plan <br /> C-11 Segment 2 Closure Sections 1-3 <br /> C-12 Segment 2 Closure Sections 4-6 <br /> C-13 Stormwater Pollution Prevention Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.