My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-147
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 1:19:57 PM
Creation date
10/6/2017 1:19:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/03/2017
Control Number
2017-147
Agenda Item Number
15.B.3.
Entity Name
CDM Smith
Subject
Segment 3 Expansion
Segment 2 Partial Closure and Landfill Gas System Expansion
Area
Design Permitting and Bidding Svs
Alternate Name
Amendment No. 1 to Work Order No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sheet No. Title <br /> CD-1 Liner and Leachate Collection System Details <br /> CD-2 Leachate Collection/Leachate Detection Sump Details <br /> CD-3 Liner and Berm Details <br /> CD-4 Leachate Collection/Detection Details <br /> CD-5 Piping Details <br /> CD-6 General and Civil Details <br /> CD-7 Closure Civil Detail I <br /> CD-8 Closure Civil Detail II <br /> CD-9 Closure Civil Detail III <br /> CD-10 Paving,Grading,and Drainage Details <br /> CD-11 Landfill Access Road Details <br /> CD-12 Gas System Details I <br /> CD-13 Gas System Details II <br /> CD-14 Gas System Details III <br /> CD-15 Gas System Details IV <br /> Mechanical <br /> M-1 Segment 3 Cells 1-4 Leachate Pump Station Plan <br /> M-2 Segment 3 Cells 1-4 Leachate Pump Station Plan and Section <br /> M-3 Segment 3 Cell 2 Leachate Detection Pump Station Plan and Section <br /> MD-1 Pump Station Details and General Notes <br /> Electrical <br /> E-1 Electrical Symbols/Abbreviations/Notes <br /> E-2 Electrical Site Plan <br /> E-3 Electrical Plan and Details <br /> E-4 Leachate Pump Station Control Panel Details <br /> E-5 Leachate Detection Pump Station Control Panel Details <br /> E-6 Installation Details <br /> Subtask 3.8 Specifications-CONSULTANT will prepare specifications,utilizing the EJCDC/CSI <br /> format(traditional 16-Division),which will consist of written technical descriptions <br /> of materials,equipment,construction systems,standards and workmanship as <br /> applied to this project.Specifications for construction will include the bottom liner <br /> system,cap liner system,granular fill materials,earthwork,piping,lift station, <br /> electrical,sod, LFG system components,and other applicable items.CONSULTANT <br /> will include incorporating the construction permit conditions into the specifications <br /> prior to award of contract. <br /> Subtask 3.9 Front-End Documents- SWDD will supply the Front-End Documents and <br /> CONSULTANT will edit them to provide the project specific information needed to <br /> bid the project.CONSULTANT will work with SWDD to develop owner direct <br /> purchase language to be included in the front-end documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.