(e) Operational plans and drawings as required in Rules 62-701.500, F.A.C. <br /> (f) Construction quality assurance plan for installation and testing of soils and <br /> geosynthetics. <br /> Subtask 4.3 Environmental Resources Permit(ERP): CONSULTANT will prepare and submit to <br /> FDEP an ERP notification prior to the start of construction.This notification will <br /> include the updated final design drawings as a courtesy to FDEP.This task order <br /> does not include additional Environmental Resource Permitting,and if required, <br /> these activities will be included in a separate Task Order. <br /> Subtask 4.4 RAIs: CONSULTANT will respond to up to two RAIs from FDEP. <br /> Deliverables: <br /> • Segment 3 Cell 2 expansion permit modification application <br /> • ERP notification letter <br /> TASK 5.0- BIDDING ASSISTANCE <br /> In this task,CONSULTANT will assist SWDD in obtaining bids for the construction of the project, <br /> assist SWDD in evaluating the bids and in assembling and awarding the contract,and will arrange <br /> and preside over a pre-bid conference. <br /> Subtask 5.1 CONSULTANT will provide a Contract Documents Package in PDF format suitable <br /> for distribution to bidders,coordinate the advertisement of the bid,respond to <br /> communications from Contractors,attend a pre-bid conference,and issue addenda, <br /> as necessary.SWDD will advertise for bids and distribute documents to the plan <br /> holders. <br /> Subtask 5.2 CONSULTANT will attend one bid opening,evaluate bids,and recommend a bidder <br /> for award of contract to SWDD.The bidding phase of the project terminates when an <br /> assumed Notice of Award is issued to a Contractor. <br /> TASK 6.0- ADDITIONAL ENGINEERING SERVICES <br /> At the request of the SWDD, CONSULTANT will perform additional engineering services for work <br /> expressly excluded from this Work Order as noted in the Assumptions above,or requested by the <br /> SWDD during the project. <br /> Additional Engineering Service may include,but not be limited to,preparation of additional design <br /> modifications,assistance in preparing documents not expressly included in the above tasks, <br /> environmental assessments,additional permitting,or any other extended/additional engineering <br /> services.A not-to-exceed amount of$25,150 is established for services related to this task. <br /> ASSUMPTIONS <br /> • SWDD will be responsible for all permit application fees. <br /> • The Segment 3 Cell 2 expansion,Segment 2 Partial Closure,and LFG system expansion <br /> will be bid as a single Contract Documents bid package to be constructed by one <br /> Contractor. CONSULTANT reserves the right to request additional compensation,should <br />