My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-147
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 1:19:57 PM
Creation date
10/6/2017 1:19:56 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the SWDD request to bid the Segment 3 Cell 2 expansion and Segment 2 Partial Closure <br /> separately. <br /> • CONSULTANT has based this proposal upon utilization of previously permitted design <br /> documents. In the event that the CONSULTANT is unable to utilize these documents, <br /> CONSULTANT reserves the right to request additional compensation in order to obtain <br /> and or complete the required scope of services. <br /> • The stormwater collection system will not require a modification to the ERP. <br /> • Segment 2 Partial Closure will not require a solid waste permit modification. <br /> • AutoCAD Civil 3D grading surfaces are not available and will need to be redeveloped. <br /> • Unless otherwise stated in the tasks,all previously performed design calculations, <br /> analysis,drawings,and reports that were prepared by Geosyntec Consultants or their <br /> subconsultants as part of,and/or referenced in,the 20-Year Renewal Permit <br /> Application and Drawings (dated September 2015),are complete,sufficient,accurate, <br /> and do not require any revisions/corrections. If CONSULTANT determines that the <br /> previously prepared design calculations,analysis,drawings,and reports are incomplete <br /> or require revisions/corrections,CONSULTANT reserves the right to seek additional <br /> compensation. <br /> • This Work Order does not include engineering services during construction. <br /> • CONSULTANT reserves the right to seek additional compensation for work performed, <br /> as agreed to by SWDD,beyond what is described in this Work Order. <br /> • This Work Order was formulated based upon the current FDEP permitted closure and <br /> expansion design. In the case that SWDD decides to utilize an alternate capping system, <br /> an amendment will be required to accommodate additional design and permitting <br /> services. <br /> • The Preliminary Leachate Pre-Treatment Evaluation will only include a desktop analysis <br /> utilizing existing information provided by COUNTY. No laboratory or treatability testing <br /> is provided in this Work Order. Design of a pre-treatment system,if required,will <br /> require additional compensation through an amendment or separate work order. <br /> • SWDD will provide leachate water quality data and have additional analysis performed, <br /> if required. <br /> • SWDD will provide influent and effluent water quality data from the West Reginal <br /> WWTP. <br /> • SWDD will provide wastewater flow rates at the West Regional WWTP. <br /> • SWDD will provide landfill leachate and sanitary wastewater flow rates from the Indian <br /> River County Landfill site. <br /> • Analysis will be performed using standard/general procedures,factors,rates,etc.either <br /> taken from reference sources or agreed upon assumptions. No detailed analysis to <br /> calculate precise values will be required/performed. <br /> PROJECT SCHEDULE <br /> The following project schedule has been developed based on authorization to provide design <br /> services being received on October 3, 2017. <br />
The URL can be used to link to this page
Your browser does not support the video tag.