ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 95 <br />Attachment A <br />titN DUKE <br />ENERGY° <br />No. 9.104 <br />The OF shalt, within one hundred eighty (180) days from receipt of the Facilities Study, <br />send written notification to the Company as to whether or not it will initiate construction <br />of the Facility. The Company will consider no response as OF's withdrawal of the <br />Facility from further consideration. The final electrical plans shall include the following <br />information, unless all or a portion of such information is waived by the Company in its <br />discretion: <br />SECTION No. IX <br />SECOND-THIRD REVISED SHEET No. 9.793104 <br />CANCELS RR$T—SECOND REVISED SHEET <br />a. 4 ---Physical layout drawings, including dimensions; <br />b_b—All associated equipment specifications and characteristics including <br />technical parameters, ratings, basic impulse levels, electrical main one -line <br />diagrams, schematic diagrams, system protections, frequency, voltage, current <br />and interconnection distance; <br />c_e.—Functional and logic diagrams, control and meter diagrams, conductor <br />sizes and length, and any other relevant data which might be necessary to <br />understand the Facility's proposed system and to be able to make a coordinated <br />system; <br />d_d—Power requirements in watts and vars; <br />e. 4 ---Expected radio -noise, harmonic generation and telephone interference <br />factor, <br />f. fes—Synchronizing methods; <br />g„ _1k—facility operating/instruction manuals; and <br />h_h—The maximum amount of energy anticipated to be delivered to the <br />Company. <br />ISSUED BY: Javier Raimondo, Director. Rates & Regulatory Strategy - FL <br />EFFECTIVE Octobes43r2646 <br />