My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 96 <br />Attachment A <br />�� DUKE <br />ENERGY. <br />SECTION No. IX <br />SECOND-THIRD REVISED SHEET No. 9.703l 4 <br />CANCELS FIRST—SECOND REVISED SHEET <br />No. 9.704 <br />The final design specification documents delivered by the QF shall be labeled as <br />"FINAL", and shall be signed, sealed, and dated by a licensed Florida Professional <br />Engineer for purposes of establishing the final design submitted by the QF based on <br />• which Company will determine impacts to its system and construct interconnection <br />facilities for the QF to interconnect with the system. <br />3.4. 3.3 --Any subsequent change in the final electrical plans shall be submitted to the <br />Company and the QF understands and agrees that any such changes could affect the <br />Company's schedules and Interconnection Costs as previously estimated. The QF <br />understands that any changes in system design after the "FINAL" design is submitted <br />shall be deemed as material or significant design changes by the QF and may result in <br />Company terminating this Agreement and re -starting the interconnection process, as may <br />be determined by the Company in its sole discretion. The QF shall be responsible for all <br />costs incurred by Company as a result of any modifications to the "FINAL" design. <br />ISSUED BY: Jester Portuondo, °tractor, Rates & Regulatory Strategy - FL <br />EFFECTIVE: Octobos44n3016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.