My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 97 <br />Attachment A <br />4", DUKE <br />ENENo. 9.RGY° <br />7Q5 <br />3.5. 3:4—Without limiting the QF's responsibility to pay for all costs under this Agreement, <br />the QF understands and agrees that the QF shall pay the actual costs incurred by the <br />Company to develop all estimates pursuant to sestiea-Sections 3.1 and—through 3.2-3 <br />hereof and to evaluate any changes proposed by the QF as a result of the final design <br />specifications. <br />The Company will issue an adjusted bill reflecting actual <br />costs following completion of the cost estimates. <br />SECTION No. IX <br />SECOND-THIRD REVISED SHEET No. 9.7O3ZQ§ <br />CANCELS FIRST ,4ECOND REVISED SHEET <br />3.6. 3.5 The Parties agree that any cost or scheduling estimates provided by the Company <br />hereunder shall be prepared in good faith but shall not be binding. The Company may <br />modify such schedules as necessary to accommodate contingencies that affect the <br />Company's ability to initiate or complete the Company's Interconnection Facilities and <br />actual costs will be used as the basis for all fmal charges hereunder. <br />3.7. 3.6—All studies required for interconnection and the construction of any <br />interconnection facilities required shall be placed in the queue in a non-discriminatory <br />and non -preferential manner relative to any other interconnection requests so that <br />Company can process all interconnection requests to the Company's system in <br />accordance with the Company's current practices and operational procedures. <br />3.8. The Company reserves the right to perform static and dynamic tests, incorporating the <br />Facility in the Company's models, that may limit/reduce the amount ofphvsical capacity <br />that OF can interconnect at Facility. In such case. the Company will report the limitation <br />to the QF who may then decide to adiust its capacity level for the next level of study. <br />3.9. The Company will consider failure by the QF to meet any of the schedule deadlines <br />herein as a withdrawal of the Facility from further consideration. <br />ISSUED BY: Javier Pordmndo, Meter, Rates & Regulatory Strategy -FL <br />EFFECTIVE: October -44,2046 <br />
The URL can be used to link to this page
Your browser does not support the video tag.