Laserfiche WebLink
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 72 <br />Attachment A <br />: DUKE <br />ENERGY. <br />ESTIMATED UNIT FUEL COST <br />SECTION No. IX <br />TENT4FLEVENTH REVISED SHEET NO. 9.458 <br />CANCELS N NTk4TENTH REVISED SHEET NO. <br />9.458 <br />$ U <br />207 <br />2818 <br />281-9 <br />2020 <br />202-1- <br />2022 <br />2023 <br />2024 <br />3:44- <br />3:49 <br />3:84 <br />4-64 <br />3-34 <br />3:96 <br />449 <br />6,43 <br />6 <br />As required m Section 25-17.0832, F.A.C., the estimated fuel costs associated w.th DEF's <br />Avoided Unit are based on current estimates of the price of natural .gas and will be provided <br />within 30 days of a written request for such projections by any interested person. <br />pELIVERY VOLTAGE ADJUSTMENT <br />DEF's average system line losses are analyzed annually for the prior calendar year, and delivery <br />efficiencies are developed for the transmission, distribution primary, and distribution secondary <br />voltage levels. This analysis is provided in the DEF's Procedures For Changing The Real Power <br />Loss Factor (currently Attachment Q) in its Open Access Transmission Tariff and DEF's fuel <br />cost recovery filing with the FPSC. An adjustment factor, calculated as the reciprocal of the <br />appropriate delivery efficiency factor, is applicable to the above determined energy costs if the <br />RF/QF is within DEF's service territory to reflect the delivery voltage level at which RF/QF <br />energy is received by the DEF. <br />The current delivery voltage adjustment factors are: <br />Delivery Voltage Adjustment Factor <br />Transmission Voltage Delivery <br />Primary Voltage Delivery <br />Secondary Voltage Delivery <br />PERFORMANCE CRITERIA <br />1.01368 <br />1.02368 <br />1.0629333 <br />Payments for firm Capacity are conditioned on the RF/QF's ability to maintain the following <br />performance criteria: <br />A. Capacity Delivery Date <br />The Capacity Delivery Date shall be no later than the Required Capacity Delivery Date. <br />B. Availability and Capacity Factor <br />ISSUED BY: Javier Portuondo, Director, Rates 8 Regulatory Strategy - FL <br />1 EFFECTIVE: June -9,2048 <br />