Laserfiche WebLink
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 73 <br />Attachment A <br />(ca) DUKE <br />1 ENERGY. <br />SECTION No. IX <br />i€N 4. _LEVENTH REVISED SHEET NO. 9.458 <br />CANCELS NINTH -TENTH REVISED SHEET NO. <br />9.458 <br />The Facility's availability and capacity factor are used in the determination of firm <br />Capacity Payments through a performance based calculation as detailed in Appendix A to <br />the Contract. <br />ISSUED BY: Javier Portuondo. DIredor. Rates 8 Regulatory Strategy - F7. <br />1 EFFECTIVE: duae-9r2838 <br />