Laserfiche WebLink
• <br />0 <br />0 <br />ORDER NO. PSC -2017 -0278 -PAA -EQ <br />DOCKET NO. 20170077 -EQ <br />PAGE 12 <br />FLORIDA POWER 6 LICIT COMPANY <br />(C1mt®aed from Shat No. 9.033) <br />Testing Procedures <br />ATTACHMENT A <br />Second Revised Shen No, 9.41M <br />Casteds First Sheet Na 9AT4 <br />6.1 The Coannisld Capacity Test must be contplerad successfully within a shdy-hmn period (the "Demonmation Poi xrj which <br />period, including the eppmximete den time of Ow Corns itled Capacity Test, Ghali be sdactd and schdddby the QS bymms ofa written <br />notice in FPL delivered at lean thirty (30) days prior b the stare of such period The provisions of ere foregoing:comae shot] not apply as <br />wry Committed Capacity Ten required by FPL mater my of the provisions of" Contract. FPL shalt have Use right to be presort onsite m <br />another my Committed Capacity Tal required orpautitledunder this Contrast. <br />61 Coumonitted Capacity Ten results shall be hard an a an period of tsmty-fore, (2o canssative M>m (Ne "Commiud <br />Capacity Test Period") st the highest srmamd era KW rating at Which the Facility carr operate without exeed'mg the design operating <br />coditiom, tarpermme, pressures, and other panomcros de6od by 14tappliuWe mmufacmer(s) Its nerdy nam operations m the Facility. <br />If tiro QS is a REF the Coumdtled Capacity Tat shall be conducted utilising as the sale foci emote fuels or energy semen melded in the <br />definition in Session 366.91, Florida Statutes. The Conermaal Capacity Test Period shall continuum at Um time designated by Uc QS <br />6.3 For the evoidonce of douh natal station service on of unit sdiaries, including, withom limiation, oonlmg rocas, hat <br />exchmems, ad other equipm ud required by law, "be In service during the ConatOd Copeoly Test Period Rather, the QS shell aRect <br />deliveriaofany quantity and quagty ofecnuacled eogaasted d® to the access hod during ere Couunitted Capacity Test period <br />6.9 The capacity of 0e Facility shall be the average net apaetty (generator ompm minus auxiliary) memmed ova me Coomtiud <br />Capacity Test Palo& <br />63 The Committed Capacity Tem shell be perfumed amodmg to pinta] Industry uxiq procedures mtisfacmry to FPL for the <br />appeopniatekshanimofIlsem <br />6.6 Except as otherwise, provided herein, results army Committed Capacity Ten shag besubmitsed to FPL by me QS Wain sera <br />(7)days ofthe conclusion ofine Committed Capacity Tet <br />Payment for Electricity Produced by the Facility <br />a=- <br />FFL ogre, to pay the QS In, energy produced by the Facility and delivered to me Delivery point in ocoordonce with ft Wool, and <br />procedures contained in FPL's approved Rme Schedule QS -2, attached hemm an Appendix A. a it may be =ended from time to 1®e and <br />prvanmn to The election of energy payment options a specified in Appendix E. The Parties ager dot Ws Construct shell be mWw to, all of <br />due provisions contained inRate Schedule Q&2 as approved and an file with the FPSC. <br />71 FimrCapeciry <br />FPL ngne, to pay Use QS for Um form capacity descn'bed in Section 5 in ammdmae with the cot, oat procedures contained in <br />Rate Schedule QS2, atachod herolo a Appendix A, as it may be amended and approved fmm time to tion by the FPSC, and pursuant to to <br />election are equity paymem option a specified in Appendix E. The QS understand, and agrees that capacity payments will be mode under <br />the early rapacity pa)matoptions only if the QS has achimd the Capacity Delivery Date ad IsdelivaNg Rim capacity and coetgy, to FPL <br />Ore elected by the QS. Ute capacity pnym,t option nnnotbechanged timing the term ofmisConuec. <br />7.3 Payments <br />Poymnhts due the QS will be rade monthly and annually by the twentieth bushh,sday following the ed of aro biking period. A <br />stomnaloftbe kilowatt-hour; mid by the QS and the applicable avoided cagy note at which payments are, being node shag aaamparry she <br />prymat to me QS. . <br />(Coahme donShatNo. 9.035) <br />Imed by: S. S. Romig, Director, Rain and Tariffs <br />Elective•. September 13, 2016 <br />