My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
08/15/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:52:19 PM
Creation date
10/26/2017 3:25:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/15/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0278 -PAA -EQ <br />• DOCKET NO. 20170077 -EQ <br />PAGE 13 <br />0 <br />0 <br />ATTACHMENT A <br />Second Revised Shea No, 9.035 <br />FLORIDA POWER & LIGHT COMPANY Cancels First Sheet No. 9.035 <br />(Conducted from Short No. 9.034) <br />8. <br />Electricity Production and Flaw Malntrmrse Sdxduk <br />8.1 During the rotor of this Contract, an lata thun sio y (60) days prior to the Capacity Delivery Date and prim to April I crunch <br />celmda yourthermBa, the QS doll submit to FPL in writing a dan0d plan or: (e)thce untoffamczpadyaadeuWWbegmeated <br />by the Facility and delivered m the Delivery Point for each month aft following calendar year. and (b) the time, duration and magoimdeof <br />any. sdm&ded maintenenun peaid(s) ad any =bdpated rduWom in ap mty. <br />8.2 By October 31 crunch calendar your, FPL shell notify the QS in writing whetber theraquestd scheduled maintenance plods <br />in the ddmldplan aeaaepleble. IfFPLobjwa loayof therequested scheduled maintenance period; FPL dull advise the QS Mme time <br />period dor<4 in the requested period(s) when the outage(s) an be scheduled. The Q$ shall schedule maintenance outage only during <br />periods approved by FPL, such approval not mmeasomby withheld Owe the schedule for maintenance has been established and approved <br />by FFL, either Puny may requcl a subsequmht change in such sahcdtdc and. asapt xbon such Ment is due to Fora Majcoa, rtqucc <br />approval for such change from the oUrcr Pasty, each approval nen to be rnmesonaby, m0deld or delayed Sdnduled maintenance outage <br />days shag he [united to seven (7) days pa =tench year orders doe manufactures rcommi dation of maintenance outage dans run 1M <br />technology and egaipmeal used by the Facility eccteds arch 7 day period, provided. such number of days Is considered reasonable by <br />prudent industry constants wad don net esxad two (2) founam (14) day mtervots, ane in the Spring and ora in the Fall in any calendar <br />year The scheduled m unmare omegedata applicable for Um QS ase_ days in the Spring ad_doys in the Fail ofeachaleda <br />your, provided the conditions specified in the previous mdma are salaried In no event shag nubrtduuun periods be scheduled dome; The <br />folkwhsg peridc June 1 through and including October 31at and Decanter I through and including February 28 (m 20 as the ase may <br />bel <br />8.3 The QS shall amply with reasonable requests by FPL regarding day -s,4* and hourby-hour communication be nvea the <br />Parties relative to electricity production and marmana vschrdulag. <br />8A Dispatch and Control <br />8.4.1 The punter supplied by to QS hereosder :ball be in Ute farm M duc*phae 60 Hertz "emad, eorenl a a nominal <br />operating voltage of ,000 sells (_ kV) and poorer factor diryachable and controllable in the range of 85%logging b <br />85% leading eamawued at the Delivery Point to maintain system operating paemam, as specified by FPL. <br />8.43 Ata0 dam during the roan of Ods Contend, the QS shall operant and maintain the Facility: (e)in sachem®aaaensme <br />coohplimce xith is oNigakm hereuoda, hn aecordence with prdentenginaring and opeeting pmetice, and applicable law, and (b) with <br />all rystem prolective equipmal in service whenever dx Facility is conceded to, or is opeald in pamlki with, FTL's $ star The QS shall <br />install at to Facility dose syean prosection and conal devices accessary or come safe and protected operaioo ofall energized aphipmea <br />during rromal tesdrg and repair. The QS shall have qualified personnel last ad alibrate all prdatirt equipment at re8alar intervab in <br />ocoda oc with good erhgmeekg and operatig prati= A unit functional trip lea shall be performed after each overhaul of Um Facility's <br />turbine, gaseraor or hailers and the results shall be provided W FPL prior to returning the Facility to service. The specifics of the unit <br />functional trip let will be consistent with good ungluing and operating pmcticev. <br />8A.3 If the Facility is separated from the FPL sysumn for rosy ramn, Duda an ciaumsmnots shoE the Q$ raroaxct the Facility <br />into FPL'a system vitow faaobtahsmg FPL'sprior writlra approval. <br />8.4.4 During to tam of lits Conrad, the QS doll employ qualified persoaxl for umogirg, operating and maintaining the <br />facility and for coordinating suds with FPL If she Facility lam a Commdud Capacity grader dun 10 MW Ihm, tie QS shag ensure tmt <br />operating permmel are on duty at all time, nveny-four (24) hours a calendar day and sever, (7) calender days a wvek. Ifthe Facility has a <br />Committed Capacity equal to or less than 10 MW than the QS shall emoe that operating pessound are on duty at led eight (8)how per <br />day from 8 AM IST to 5 PM ISI' from Monday to Friday. xith an operator an call mall otherhoura <br />8.45 FPL shall at all tires he excused from it, obligation to purchase and rceive energy, and capacity heramder, and FPL shall <br />have the ability to require the QS to council or reduce deliveries oraegy, to the totem rxcessery (a) to maintain Me reliability and integrity <br />army pmt ofFPL's ryster, (b) in the event that FPL dMmirm Data father to do an is Moll, to endengerlife or properly, or (c) is to <br />smelt in signiUaat disruption ofelaw is service to FPL'sautar a , FPL shall give the QS Prior maim ifpmetable,ofitsintem an ¢fuse, <br />catall or reduce, FPL's acceptance ofinergy and fun capacity pursuent in this Section and soli act to minimize lire firupe ncy ad duration <br />ofmch auwrenaa <br />(Continued on Shod No. 9.036) <br />famed by: S E. Romig, Director, Rates and Tariffs <br />Effective. September 13,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.