My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
08/15/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:52:19 PM
Creation date
10/26/2017 3:25:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/15/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0278 -PAA -EQ <br />DOCKET NO. 20170077 -EQ <br />PAGE 14 <br />ewtswn avwca s utas wmraus: <br />(Cnimued from Sheet No. 9.035) <br />ATTACHMENT A <br />Second Revised Sheet No. 9.036 <br />9*6 At providing mike m Ore QS, FPL shall not be required to purchase or raise energy, fiam aha QS during ay period in <br />which, due to operational cirmmvanm, the purchase or accept of such energy =old result in FPL's lamming costs greater than thou <br />which it aurid inar Wit did rt make such purl amt At example of curb n aaumma<woud be a period during which Oa lard being <br />served is such Wert the generating units on line are base load Mits opemtbmg at Weir mmhmon continuum matings aha the purchase of <br />additional energy "old require taking a base load wit oROa line and replacing the ramoWng load saved by that unit with pealing-ypc <br />gemsstk n. FPL shag give the QS as much prior rake as practicable of its mtml not to purchase W receive energy and firm Capacity <br />pursuant to this Section. <br />8A.7lfthe Facility has a Canntitted Capacity Ice, Um 75 MW, mutual, scheduling and dkpntch of famcapaciy aha energy shall <br />be Ove roponsibility of the QS. If the Facility has a Commcted Capacity Healer then or equal m 75 MW. than contioL scheduling and <br />dispatch of fort, capciy and energy shall be the responsibility of the QS, except during a "Dispatch Hour", Le., my dodo boor for which <br />FPL requests the delivery of such capacity and energy. During ary Dispatch How (a) mnwl of the Facility w01 either be by Seller's <br />mnnud coawl and= the direction of FPL (wLdherom0y or in writing)or by Antarctic Generation Control by FPL -s system control ants <br />as dammhrcd by FPL, and (b) FPL may request that the real pores mtW be M any levd up to the Conuoitted Capacity of the Facility, <br />provided, in no event shall FPL require the real power output of the Facility to he below the F&;Biy'sMmimvm Lood without decoowit ing <br />the Facility. The Facility dao deliver the capacity and cagy requested by FPL within _ minutes, tel ft into aaoant the opeetiog <br />tinintiora ofthe gm"ffig apipmmt n spailiedby themmmfactmer. provided rah tbm paid rgeciGei baeht iscornvdereda®mble <br />by prudent indumy standards for the technology and equipment being utilized and amaning rive Facility is operating at or above its <br />Minas Load Stmt -up Wr fiom Cold Shutdown and Facility Tura uod time Goa Hot to Hot will be hien into mm(deaiw provided <br />such are rmsenbleand consincol with prudent industry practices for the technology and equipment being utilized The Factity's Operating <br />Characteristics have been provided by We QS and aur safort in Appendix D. Section IV ofRMe Schedule QS•2- <br />&4S If the Facility has a Coanitted Capacity of less Wen 75 MW. FPL may require during certain periods, by and. wvitim, or <br />decbontc rtiGation that the QS came the Facility m red= output to a level below, the Co®sed Capacity but not lower Wen the <br />Facility's Minims Lod. FPL shall provide as much notice as pmacticabk, rmaaly such Mike will be of M head fear (4) hours. The <br />frequency of such request ahall net exceed eighteen (19) times per calends, year and the duration ofeach request shag awl aaad faro (4) <br />homy <br />9.4.9 FPL's amelse of in rights under Wds Section 9 stall not give ripe to any liability copayment obligation on the part of FPL, <br />melding any claim for branch ofsonhaaor forbrech armycovmnl of god Nth and fairdeaft <br />9. CompkdeNpeaormareSearity <br />9.1 As security for the achievement of the Guaranteed Capacity Delivery Date ad satisfactory performawe of its obligation <br />hereunder, the QS shall provide FPL either. (a) an unconditioned, irrevocable, davulby later of aatigs) with an aspiration data an earlier <br />Wen the cad of the fust (In) mmiversary, of the Capacity Delivery Data (or the rind businen day therw0erk issued by o US. commercial <br />bade or the U.S. branch are foreign bank having a Credit Rating ofA-or higher by SRP aA3 or higher by MWdy's(a "Quelled Ismer"), <br />in form and substance acceptable to FPL (including provision (i) permitting partial and fall draws and iii) permitting FFL to draw m full df <br />such lata of credit is not renewed w replaced as Minird by the kmuhereafal kat Wiry (30) budaess days prior to it, expiration dale) <br />("Letter of CmeWA (b) a bad, issued by a financially and Company acceptable m FPL ad in a far and absence saepnble n FPL• <br />("Rad"), or (c) a cash collateral deposited with FT'L ('Cash Collateral') (my of (a). (b), or (ck the'CompledodPcfommmco Security") <br />Compledon/Peefamnnce Security shall be provided in the amount and by the datelined below. <br />(a) 550.00 per kW (for five nswberof kW of Committed Capacity mat forth in Section 5.1) to be delivered n FPL within five (5) <br />taninesssdays ofthe Effective Data; and <br />(b)SIOO.00 per kW (for the nasherofkW ofCommfOed Capacity set forth in Section 5.1) m be delivered as FPL two years before <br />the Guermtecd Cepeciy Delivery Date. <br />'Credit Ratite• man withinput w arty entity, m mydateofdaammation.Oa respmdn ratbW Orn assignedm rah cnGys <br />uaucured, senior long -tem debt or deposit obligations (Mt supported by third party credit abate aaq by SRP. Moodys m other <br />specified wing agency a agencies or if curh entity does not hese a rating for its unsecured, senior long -tat debt "deposit obligd ksm, <br />than the rating assigned to such entity, as its *componaeaedit mting' by SRP. <br />-M22&Y mens MoodyifasenmaSecvicq toe. or itssueaesmt. <br />'Wr mans Standard R Profs Ratings Group(a division of The MoQmvv HRl Companies, Inc.)or it, successor. <br />(Comb rand on Sion Ho. 9. W 7) <br />Ismd by: & L Romig, Director, Rates and Tariffs <br />Effective: September 13, 2016 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.