My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
08/15/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:52:19 PM
Creation date
10/26/2017 3:25:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/15/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0278 -PAA -EQ <br />. DOCKET NO. 20170077 -EQ <br />PAGE 45 <br />• <br />• <br />ATTACHMENT A <br />FLORIDA POWER & LIGHT COMPANY Orlithad Sbcel N0,10317 <br />(Confinud fmm Sheet No. 10316) <br />FV. PLANT DLSPATCHAHIUrYfCONFROWBILIFY - <br />• provide the following Operating chamtlaisrtm and adetailed explanation supporting line pmronnacecapabilities indicated <br />• RaM14e(hlWhminule) <br />• Feek Cgsibility(%above Comvdtid Capacity) <br />• Mm®um powclevel I%ofComminerlCapacity) <br />• Facility Ti maroud Tme Hot bHot (hours) <br />• StmoupThm from Cold Sinadown (eme) <br />• OultC)•dmg(IcycleW) <br />• MW end WAR Control (AOC. Mannal, Odes (plm¢explain)) <br />V. SITINGANDLICHNSING <br />• provide a IieeveuQ/permiamg milestone w3dule which lists all permits, Ikemus ed variances required to site the Facility. <br />Themilestoneschdi shallabo identify key vuleame darn for bazlme monitoring, application preiureboq egemy anmv, <br />certification and lieaninghitiog board approval, and agency pennil issuance <br />• Provide a IiundngrpanlitWg plan 00 addresses the Isom of air ®issim now use, wmsewater dlscbmge, wetlands, <br />c dmugerd specks, Wotatd propertim solid waste, surrounding Ind u e, carting for the Facility, associad Haar facigdes, <br />and st"cat of and opposition to the Facility. <br />• List [be cmistiode0bumd dimhmgo limits 0m Facft will mmM and describe an demi) the pollution control oqukmmt to be <br />used to mal throe 1®b <br />VL FACRM DEVELOPMENT AND PERFORMANCE <br />• SLbmit a deWW engineering, precumnml, combustion, amrrup and commercial ependioo whittle. The schedule sbail <br />iande milestones for site acquisition, m8rmaing insists, selection of at ruajor a ialpment vendors, arcbilat mgira m, EPC <br />contractor. ad Facility opmeta, exam has Wegmtion, and delivery ofmyjorequipment. A discussion of theeuurml stabs or <br />catch milestone should abo be included where applicable. <br />• Attach a diagmm of the power block m argemmt Pmvide a Em of the major equipnml vendors and the alma and model <br />number of the majorequipmml to be bsifa0ad <br />• Provide a deWTed descript oo of Uro propoad emironsrrmW control technology for dm Facft and describe the capabilities <br />oflhe propme0 tecMromgy. <br />• Attach p1di nimry Row diograma for the steam systmn, water system, and fuel system, and amain electrical cm Sum diagram, <br />lalheracilty. <br />• Stale the expected I nib ram (HHV) at 75 degrees FaWmheit for loads of tom 7514, and 50%. In addition, attach e <br />prel hrdmry hest belmra fm xhe FaciOty. <br />• (NOTE: told my requirmmts related to demomtrating dot the facility nab the mqusamenb under the dame a applicable <br />mica] <br />(fkntbmed on Shur No. 10.318) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: May23,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.