Laserfiche WebLink
Page 3 of 3 <br />DISCUSSION: <br />Questions & answers <br />Pat Walther, Carter Associates, highlighted a storm water catch basin on the northeast corner or <br />the intersection that will need 3 sides raised and filled around for construction of sidewalk to <br />provide proper grading. <br />Question: What elevation is FPL raising their lines? <br />FPL will be raising them enough to provide proper clearance based on the design plans. <br />Relocation is handled outside of this contract. Contractor will not be responsible for coordinating <br />relocation of the distribution lines with FPL. <br />All lifting and installation of the mast arms and coordinating of activities with FPL will be the <br />responsibility of the contractor. <br />All RFI's to be submitted by August 61h 2017. <br />Zones for video detection are not shown on plans. A sketch of the zones will be provided in an <br />Addendum. <br />All fiber to be installed underground. <br />ATTACHED: <br />Sign in Sheet <br />Typical Detector Zone Detail <br />F:\Public Works\ENGI VEERING DIVISION PROJECTS\I643 27th Avenue at 21st Street SW Intersection_Signalization <br />Improvements\I-AdmitMleetings!Pre-Bid Meeting\1643 Pre Bid Agenda_Minutes.doc <br />