My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-194
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2017 10:23:38 AM
Creation date
11/22/2017 10:23:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/21/2017
Control Number
2017-194
Agenda Item Number
8.L.
Entity Name
Van Antwerp
Kimley Horn and Associates
Countryside Citrus
Subject
Water Supply Restoration
Project Number
Work Order 16
Alternate Name
Mitigation Plan Wellfields
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Indian River County Department of Utility Services <br /> Van Antwerp Property (Countryside Citrus) Water Supply Restoration <br /> and Well Addition <br /> PROTECT UNDERSTANDING <br /> Indian River County Utilities (IRCU) is in the process of mitigating water <br /> withdrawal impacts to the Van Antwerps (VA) existing groundwater wells from the <br /> Hobart wellfield. The following scope consists of meetings and discussions, <br /> preparation of documents, coordination, and implementation of the construction of <br /> one new supply well, wellpump, and retrofitting one of Van Antwerps (VA) <br /> irrigation supply wells #1 with submersible pumps & motors. The intent is to <br /> restore, improve and preserve capacity of these wells from future impacts from the <br /> Hobart wellfield. <br /> SCOPE OF WORK <br /> Below is the anticipated scope of work for VA Farm (Countryside) raw water <br /> supply and well addition. <br /> TASK 1 - MEETINGS AND DISCUSSIONS <br /> Consultant will attend meetings, participate in conference calls, and be available for <br /> discussions with Indian River County Utilities (IRCU) staff, St Johns River Water <br /> Management District (SJRWMD), the Van Antwerps, and others. Consultant will <br /> prepare for these meetings, including preparation of documents, participate in pre- <br /> meeting discussions, and provide follow up to the meetings and discussions. <br /> Consultant will attend and participate in conference calls during design and <br /> implementation of the work described herein. It is assumed that weekly conference <br /> calls will be attended initially, with call frequency reducing to twice monthly <br /> during implementation of the work. <br /> TASK 2 - PREPARE DOCUMENTS FOR NEW SUPPLY WELL <br /> Consultant will prepare design documents and technical specifications for one new <br /> permanent 6-inch Floridan aquifer supply well #6 for the VAW property, and <br /> installation of a new submersible well pump in the existing VAW well (#1). <br /> C\Users\mark miller\Documents\IRCt1 Van Antwerp Water Supply Restoration 117 17 docs Page I of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.