My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-194
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2017 10:23:38 AM
Creation date
11/22/2017 10:23:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/21/2017
Control Number
2017-194
Agenda Item Number
8.L.
Entity Name
Van Antwerp
Kimley Horn and Associates
Countryside Citrus
Subject
Water Supply Restoration
Project Number
Work Order 16
Alternate Name
Mitigation Plan Wellfields
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will prepare 90% review documents and submit electronic copies to <br /> IRCU staff for review. Consultant will revise the documents to include IRCU <br /> comments and prepare final documents to be used for bidding or procurement of a <br /> contractor to construct and implement the work. <br /> Consultant will prepare mechanical, civil, well and wellhead details, and electrical <br /> drawings for the scope of work assuming up to six (6) to eight (8) drawings. <br /> Consultant will select pump and motor sizes, and assist with pump system startup <br /> and testing of well and pump assembly during startup. <br /> Electronic copies of final drawings and technical specifications will be provided to <br /> IRCU for bidding, including up to 6 copies of drawings (11x17) and specifications <br /> booklet (8-1/2 x 11). <br /> TASK 3 - COORDINATION <br /> Consultant will provide coordination with FPL, Indian River County, and VAW in <br /> the siting of the well and final sizing of the service. <br /> Consultant will coordinate with pump and electrical equipment suppliers, local <br /> drillers, and contractors. <br /> Consultant will coordinate replacement of the existing end-suction well pump at <br /> VAW well #1 and electrical upgrades which may be necessary. <br /> TASK 4 - CONSTRUCTION PHASE, FINAL IMPLEMENTATION <br /> Consultant will provide construction phase services consisting of bid and/or <br /> procurement phase, review of bids/price proposals, on-site observation of well <br /> drilling and mechanical installation activities, review of submittals, and operational <br /> testing of designed system. <br /> The Consultant shall have no responsibility for any contractor's means, methods, <br /> techniques, equipment choice and usage, sequence, schedule, safety programs, or <br /> safety practices. <br /> Consultant will provide construction phase services including hydrogeological <br /> services, performance testing of well, and preparation of a brief well completion <br /> report for well. Consultant will utilize subconsultant services of JLA Geosciences, <br /> Inc. for the Hydrogeologic Consulting Services (JLA). <br /> C\Users\mark miller\Documents\IRCl1 Van Antwerp Water Supply Restoration 117 17 doc.e Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.