My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-194
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2017 10:23:38 AM
Creation date
11/22/2017 10:23:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/21/2017
Control Number
2017-194
Agenda Item Number
8.L.
Entity Name
Van Antwerp
Kimley Horn and Associates
Countryside Citrus
Subject
Water Supply Restoration
Project Number
Work Order 16
Alternate Name
Mitigation Plan Wellfields
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will provide hydrogeological support and observation services during <br /> construction of the new 6-inch well. Consultant will provide up to 64 hours of on- <br /> site hydrogeological services (JLA) for the new well. Consultant will review <br /> drilling, geologic and geophysical data and provide recommendations for casing <br /> setting depths and completion intervals. Consultant will review pump test results <br /> and provide recommendations for permanent pump setting depth. Consultant will <br /> coordinate water quality testing. <br /> Consultant will provide limited contract document interpretation, shop drawing <br /> and pay request review and change order requests. Shop drawing submittal will be <br /> reviewed for conformance with the intent of the contract documents. <br /> JLA will prepare a brief well completion report, including a summary of the <br /> lithologic logs, field logs, hydrologic and water quality data, and preparation of <br /> figures, data, lithogic logs, and appropriate attachments. Four (4) final copies of the <br /> report will be furnished to Owner. <br /> The installation of the well pump, column piping, and electrical service for <br /> operation of the well will be observed, including startup and operational testing. <br /> Contractor to provide coordination of startup. Consultant will attend up to two (2) <br /> progress meetings, review construction related issues, and provide coordination <br /> where needed. <br /> ITEMS FURNISHED BY OWNER <br /> The following items will be furnished by the Owner and are necessary for <br /> completion of the tasks described herein. <br /> • Access to site <br /> • Preparations of front-end bid documents <br /> SCHEDULE <br /> Consultant will provide these services as expeditiously as practical and mutually <br /> agreed upon schedule. Consultant will strive to accommodate the following <br /> schedule: <br /> 1. Prepare Documents 4 - 6 weeks <br /> 2. Bidding/Procurement 4 - 6 weeks <br /> 3. Award/Contractor Mobilize 4 - 6 weeks <br /> 4. Drill well 4 - 6 weeks <br /> C\llsers\mark nnlier\Documents\IRCU Van Antwerp Water Supply Restoration 117 17 docx Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.