Consultant will provide hydrogeological support and observation services during <br /> construction of the new 6-inch well. Consultant will provide up to 64 hours of on- <br /> site hydrogeological services (JLA) for the new well. Consultant will review <br /> drilling, geologic and geophysical data and provide recommendations for casing <br /> setting depths and completion intervals. Consultant will review pump test results <br /> and provide recommendations for permanent pump setting depth. Consultant will <br /> coordinate water quality testing. <br /> Consultant will provide limited contract document interpretation, shop drawing <br /> and pay request review and change order requests. Shop drawing submittal will be <br /> reviewed for conformance with the intent of the contract documents. <br /> JLA will prepare a brief well completion report, including a summary of the <br /> lithologic logs, field logs, hydrologic and water quality data, and preparation of <br /> figures, data, lithogic logs, and appropriate attachments. Four (4) final copies of the <br /> report will be furnished to Owner. <br /> The installation of the well pump, column piping, and electrical service for <br /> operation of the well will be observed, including startup and operational testing. <br /> Contractor to provide coordination of startup. Consultant will attend up to two (2) <br /> progress meetings, review construction related issues, and provide coordination <br /> where needed. <br /> ITEMS FURNISHED BY OWNER <br /> The following items will be furnished by the Owner and are necessary for <br /> completion of the tasks described herein. <br /> • Access to site <br /> • Preparations of front-end bid documents <br /> SCHEDULE <br /> Consultant will provide these services as expeditiously as practical and mutually <br /> agreed upon schedule. Consultant will strive to accommodate the following <br /> schedule: <br /> 1. Prepare Documents 4 - 6 weeks <br /> 2. Bidding/Procurement 4 - 6 weeks <br /> 3. Award/Contractor Mobilize 4 - 6 weeks <br /> 4. Drill well 4 - 6 weeks <br /> C\llsers\mark nnlier\Documents\IRCU Van Antwerp Water Supply Restoration 117 17 docx Page 3 of 4 <br />