My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/29/1992
CBCC
>
Meetings
>
1990's
>
1992
>
9/29/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:33 PM
Creation date
6/16/2015 11:19:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
09/29/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
archeol <br />g. Wells, free-flowing or valved;. <br />h. Buildings, structures, or driveways and their <br />disposition (to be removed, to remain, to be <br />altered); <br />i. Utilities services and facilities, 'including <br />water, sewer, electric, telephone, cable; <br />J. Easements. <br />9.- Vehicular and pedestrian systems circulation plan, <br />including typical or potential travelway surface <br />and right-of-way widths, proposed connections to <br />existing streets and the planned street network in <br />the vicinity of the project. Existing . . . . <br />streets and driveways within three hundred (300) <br />feet of the project area. <br />10. A traffic impact analysis if required by the <br />Chapter 952 regulations, in accordance with the <br />Chapter 952 regulations. <br />11. Vicinity map, showing the land area within three <br />quarters (3/4) of a mile of the project area. <br />12. Proposed stormwater management design and a signed <br />and sealed letter from a professional engineer <br />certifying the conceptual stormwater management <br />plan will be able to meet all applicable stormwater <br />management and flood protection criteria of Chapter <br />930 relating to the retention/detention <br />requirements of the appropriate Land Development <br />Regulations. Unless requested by the applicant and <br />approved by the Public Works Director, the <br />conceptual plan shall in no way be construed as a <br />final design as required by Chapter 930. The <br />results of the drainage study required under <br />Chapter 930 shall govern the retention/detention <br />areas of the final site plan or plat. <br />13. When development or alteration of Jurisdictional <br />wetlands is Proposed, the applicant shall provide <br />the Environmental Planner with a qualitative <br />assessment of the existing wetlands and indicate on <br />the plans if wetlands mitigation is proposed on- <br />site, off-site, or is to be satisfied by payment of <br />a fee -in -lieu of direct mitigation. <br />a. If on-site mitigation is proposed, the <br />applicant shall indicate if restoration and/or <br />approximate area ana location of such <br />restoration and/or creation, the type of <br />wetlands to be restored or created and <br />alteration/mitigation area ratios. <br />b. If off-site mitigation is proposed the <br />applicant shall indicate the off-site area(s) <br />to be used for mitigation and the information <br />i., nsn sti....... <br />c. If a fee -in -lieu of mitigation is proposed <br />the applicant shall provide an estimate of th <br />fee amount, based on the assessed value of th <br />Project site and the area of wetlands to b <br />15 <br />�D K'PLC'732 <br />
The URL can be used to link to this page
Your browser does not support the video tag.