Laserfiche WebLink
r <br />Sao rr Pta 755 <br />B. The buffer improvement(s) shall be li <br />buffer easement(s) as designated on <br />subdivision plat. Said easement <br />depicted on the final plat and shal <br />to the subdivision's property owner <br />to ensure maintenance of the buffer <br />The buffer easement improvement) <br />considered a required subdivision i <br />shall be provided in accordance with <br />of section 913.08 of the Lan4 <br />Reaulations. <br />wi <br />association <br />provements. <br />shall be <br />C. No structure(s), other than those related tc <br />buffering, drainage or utilities, shall be located <br />in the buffer easement. <br />7. Minimum building setbacks as specified in 971.41(9)(b)3 <br />and 4, above, shall be depicted as a residential building <br />envelope on the preliminary plat. Language shall be noted <br />on the final plat to the effect that specially -approved <br />setbacks are in effect on the lots. <br />SECTION 34: Section 971.27 of the Regulations for Specific Land <br />Use Criteria chapter of the Land Development Regulations is hereby <br />established to read as follows: <br />Private Land Clearing Debris Burning Facilities (special <br />exception). <br />,(a) Districts requiring special exception approval (pursuant to <br />the provisions of 971.05): A-1, A-2, A-3. <br />Additional information requirements: a site plan meeting all <br />the requirements of Chapter 914, which shows • the location and <br />specification of all screening materials; the location and <br />desianation of all thoroughfare roads which serve the site; <br />and occupied structures within five hundred (500) feet of the <br />Burn area; the location of proposed stockpiles and the burn <br />area; and all required setbacks. <br />.LEI Criteria for land clearing private debris burning facilities: <br />1. There shall be, at minimum, a five hundred (500) foot <br />separation distance between the burn area of the facility <br />and any occupied structure in existence at the time of <br />the site plan application. <br />2. The use shall be limited to property with an AG -1, AG -2, <br />or_AG 3 land use Plan designation. <br />3. The facility shall have direct access to a thoroughfare <br />Plan road, or direct access to a non -thoroughfare plan <br />road that has a traffic volume of less than forty (40) <br />trip ends per day. <br />4. No debris storage or burn area shall be within 300 <br />feet of any property line. <br />5. Prior to site plan release the applicant must provide the <br />county a copy of the -appropriate Florida Department of <br />Environmental Regulation (FDER) permit or other written <br />approval or letter of no objection from FDER for the <br />proposed_ project. 38 <br />