My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/07/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
11/07/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 12:00:54 PM
Creation date
12/13/2017 3:45:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
449
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Velume-49-4 <br />DI II CQ KIM MCh1 <br />3. METERING <br />The Customer shall provide a suitable location satisfactory to the Company for its metering <br />equipment. <br />This location shall be convenient and accessible at all times to the Company for its meter <br />readers and other agents. This location shall conform with all local, State and Federal <br />requirement . <br />The representatives of the Company shall be given access to the premises of the Customer <br />at all reasonable times for obtaining meter readings, for shutting off the flow of gas for reasons <br />herein prescribed, for inspection of piping and appliances, and for inspecting, removing, repairing, <br />or protecting from abuse or fraud any of the property of the Company installed on the premises, <br />and particularly for emergency purposes. <br />The Company in its sole discretion may install, at its expense, an Automatic Meter <br />Reading ("AMR") device to monitor a Customer's gas consumption. However, when gas is to be <br />delivered at a pressure in excess of the Company's standard gauge pressure or such <br />equipment is required by the Rate Schedule under which the Customer will receive service, the <br />Company shall determine any necessary equipment inclusive of compensating and AMR <br />devices, including devices capable of providing daily readings, to be installed at the Customer's <br />expense. If an AMR device is requested by the Customer, the AMR device and any necessary <br />appurtenances shall be installed at the Customer's expense if the installation is deemed feasible <br />by the Company. When such devices require attachment to telephone and/or electric utilities, <br />the Customer shall provide and pay for suitable connections unless the Company elects to <br />make such connections. <br />Customer shall not tamper with or remove meters or other equipment or permit access <br />thereto, except by authorized employees or agents of Company. <br />All equipment furnished by the Company shall remain its property and may be replaced <br />whenever deemed necessary by the Company or as required by the Commission and may be <br />removed by the Company at any time after discontinuance of service. Payments made by the <br />Customer shall not give the Customer ownership of the equipment. <br />Issued by: Carolyn Bermudez Effective: <br />Vice President, Florida City Gas <br />Florida City Gas <br />FPSC Natural Gas Tariff <br />Volume No. 9 Original Sheet No. 10 <br />RULES AND REGULATIONS (Continued) <br />3. METERING (Continued) <br />The Customer shall be liable to the Company for damage to or loss of meters, connections, <br />or other Company property on their premises due to negligence or carelessness on the part of the <br />Customer, members of their household, their agents, or employees <br />
The URL can be used to link to this page
Your browser does not support the video tag.