My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/05/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/05/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 12:57:34 PM
Creation date
12/21/2017 11:37:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/05/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k01 South Crown Way eSuite 29Weiiiugton FL 3341-4 <br />Phone (561) 791-3980 *Fax (561>). 745-1693 <br />August 14, 2017 <br />Indian River County <br />Public Works Department/ <br />Facilities Management <br />1801 2r Street <br />Attn: Mr. Chuck Belcher <br />Vero Beach, FL. 32960 <br />Re: Install underground chilled water piping loop for health Department Building <br />Mr. Belcher, <br />We would like to take a moment to thank you for allowing us to provide pricing for the above- <br />mentioned project work. We understand that you have a choice in contractors to perform this <br />work and appreciate you including us in the process. <br />Our pricing is based on information collected during several visits, as well as information <br />provided -:by you. <br />Based on the information provided we propose the following: <br />Project scope of work: <br />■ Furnish GPR study as needed <br />■ Furnish and install approximately 520' of uninsulated HDPE type chilled water supply <br />piping — installed using a- directional boring procedure <br />■ Furnish and install approximately 520'. of uninsulated HDPE type chilled water return <br />piping — installed using a directional boring procedure <br />■ Furnish and install two (2) 6' x 6' x 60" precast concrete underground valve boxes with <br />hinged manhole covers <br />■ Furnish and install four (4) 6" steel weld tee — to allow for emergency temporary chiller <br />hook up <br />■ Furnish and install twelve (12) 6" steel weld flanges <br />■ Furnish and install six (6) 6" flanged butterfly valves <br />•. Furnish and install four (4) 6" x 4" steel concentric reducers <br />■ Furnish and install approximately 40' of 6" steel piping <br />Furnish and install approximately 60' of 4" steel piping <br />Furnish and install four (4) 6" blind flanges <br />■ Shut-down_existing_chiller.and . chilled water pumps <br />■ Tag -out electrical for safety - <br />■ Tie-in new underground piping loop to existing chilled water pump loop in each chiller <br />yard —Main Complex chiller enclosure and Health Department chiller enclosure <br />■ Open isolation valves allowing water to flow through the new underground piping <br />■ Purge air from the system <br />P174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.