Laserfiche WebLink
.1TKI ,J OR <br />EXHIBIT A <br />Proposal to Provide <br />Professional Engineering Services <br />fo r <br />Indian River County — GEC Work Order 06 <br />Phase 2 — Permitting, Construction Plans, Bidding, and Construction Services <br />Wabasso Fishing Pier Demolition <br />Wabasso, Florida <br />Indian River County (County) has requested services in support of the Wabasso Fishing Pier Demolition <br />Project under the terms of Continuing Contract Agreement for Professional Services (dated November 15, <br />201 1) and Contract renewal (dated November 4, 2014). The Wabasso Fishing Pier was significantly <br />impacted by the passing of Hurricane Matthew in early October 2016, causing the loss of 100' from the <br />525' west span and 300' from the 475' east span. The County has requested services to assist in the <br />environmental filed surveys, engineering planning and design, permitting, bidding, and construction <br />services for the full demolition of the Wabasso Fishing Pier. <br />It is anticipated that the demolition will include the following elements: <br />o West Pier <br />■ Removal of eight intact 50' pier span sections <br />■ Removal of one intact 25' pier span section (at abutment) <br />■ Removal of two damaged/displaced/submerged 50' pier span section <br />■ Removal of eleven intact pile pairs with caps <br />■ Removal of 150' of upland sidewalk <br />o East Pier <br />■ Removal of three intact 50' pier span sections <br />■ Removal of one intact 25' pier span section (at abutment) <br />■ Removal of six damaged/displaced/submerged 50' pier span section <br />■ Removal of five intact pile pairs with caps <br />■ Removal of five damaged/displaced/submerged pile pairs with caps <br />■ Removal of 100' of upland sidewalk <br />These services are expected to be completed in two phases. Phase 1 — Data Collection and Preliminary <br />Planning, was covered in a previous Task Order and is complete. This Task Order will cover Phase 2, and <br />will include design, permitting, bidding, and construction services. <br />At the request of the County, Atkins (Engineer) has prepared this Phase 2 scope of services as follows: <br />SECTION 1 PHASE 2 SCOPE OF SERVICES <br />TASK 1: PERMITTING ASSISTANCE <br />The Engineer shall assist the County in their efforts to secure regulatory approval for the Project. The <br />permitting agencies are independent government agencies, and the Engineer cannot make any guarantee in <br />regards to the ultimate issuance of permits or the duration of the process. The Engineer will utilize their <br />experience with the permitting process to help facilitate as smooth and efficient a process as is possible to <br />the benefit of the Project. <br />Page l of 7 <br />P29 <br />