My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-001
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2018 9:06:34 AM
Creation date
1/10/2018 9:44:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2018
Control Number
2018-001
Agenda Item Number
8.D.
Entity Name
Masteller & Moler, Inc.
Subject
Hobart Park Baseball Fields
Ballfield Renovation and Expansion Project
Work Order No 5
Area
east side of 58th Ave at 77th St
Document Relationships
2018-130
(Cover Page)
Path:
\Official Documents\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Project No. 1759 <br /> HOBART PARK BASEBALL FIELDS—Work Order No. 5 MM File#1756 <br /> Page 2 of 5 <br /> The site is proposed to be provided with an infield practice area directly west of the existing southern field. <br /> Stabilized field parking is proposed to be located to the north of the infield practice area with sufficient <br /> concrete paved spaces to accommodate ADA requirements. Concrete sidewalks meeting ADA standards shall <br /> be provided from the ADA parking stalls to ADA seating at bleachers for each of the three (3) planned fields. <br /> Stabilized field parking with no specific alignment will also be planned north of the College style field. The <br /> parking areas will be accessed from 58th Avenue (Kings Highway) by new driveway connections. The existing <br /> driveway access to the site on 77th Street(Hobart Road) is intended to be gated/closed to public access. <br /> The project will include properly sized concrete pads for bleachers. The bleachers shall be provided by <br /> County. The portions of the concrete pads for pedestrians will meet ADA regulations. <br /> The site's stormwater treatment and attenuation system will be provided by an expansion to the existing dry <br /> retention system on the east side of the Parks Division Main Office. <br /> SECTION II-SCOPE OF SERVICES <br /> As agreed upon between ENGINEER and the COUNTY, the ENGINEER shall provide Professional Engineering <br /> services to complete all tasks as outlined in this Work Order No. 5 as follows: <br /> Schematic Design: <br /> We shall develop a Conceptual Site Plan depicting the proposed horizontal location of the planned baseball <br /> fields and vertical construction improvements along with locations for supporting parking, infield practice <br /> area, site lighting for the north and east fields,ADA compliant parking spaces and pedestrian sidewalks, and <br /> driveway connections to 58th Avenue. <br /> Floor plans for the design for the vertical construction elements consisting of the new concession/press box <br /> / restroom facilities will be provided by an architectural sub-consultant based on an agreed upon <br /> programming schedule. We anticipate using Donadio & Associates for the architectural services on this <br /> project. <br /> The Conceptual Site Plan shall be submitted to County for review and comment. We shall make reasonable <br /> revisions to the Conceptual Site Plan to address comments. Once the Conceptual Site Plan has been approved <br /> by the County it shall be considered the approved Base Plan for the project. <br /> Design Development: <br /> Following approval of the Conceptual Site Plan, we shall develop Preliminary Site Plan horizontal & grading <br /> designs for the project to include the existing southern baseball field, new northern College style field, and <br /> new east Softball / Little League field along with supporting parking facilities, infield practice area, site <br /> lighting, ADA compliant parking & pedestrian sidewalks, driveway connections to 58th Avenue, water & <br /> wastewater services, and landscape improvements. The Preliminary Designs will depict both horizontal and <br /> vertical information for the proposed site work improvements. <br /> The Preliminary Site Plan shall be supported by a Stormwater Management Report containing treatment and <br /> attenuation modeling and storm conveyance computations. The computations will also include flood balance <br /> calculations (if required). It is understood the County prefers the stormwater system to be an expansion of <br /> the existing dry retention system which serves the Parks Division Main Office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.