Laserfiche WebLink
The Roadway set of plans shall consist of the following: <br />"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br />1. Project shall be completed as follows: <br />a. The time for completion of the 100% design drawings for the plan revisions <br />requested by the COUNTY shall be two (2) months from the date of execution <br />of this ADDENDUM. <br />2. Deliverables -The ENGINEER shall provide the COUNTY: <br />a. Three (3) 11" x 17" paper signed and sealed of the 100% plans. Also, a pdf <br />format set of the plans on a cd. <br />b. FINAL five (5) 24" x 36" paper signed and sealed "hardcopy", AutoCad <br />drawing file and PDF formats on CD. <br />c. Work Product shall be prepared and supplied in State Plane geometry (NAD83 <br />2007 adjustment if applicable); digital versions are to be prepared and <br />submitted so that the COUNTY or other consultants can readily use it for the <br />design and analysis of the area, as defined. It shall contain all information <br />necessary for third -party surveyor to independently recreate and/or utilize the <br />survey work. It is acknowledged all final products become property of Indian <br />River COUNTY and will be available for use by the public at large. <br />"SECTION V — COMPENSATION" is being modified to incorporate the following: <br />Page 2 of 5 <br />G:\LNR Support\Proposa1s\WPB\2017\SR 60 & 43rd Avenue\SR60 - 43RD AVE AMENDMENT 9 12-8- <br />17.doc <br />30% <br />60% <br />90% <br />100% <br />Cover Sheet <br />X <br />Typical Sections <br />X <br />Summary of Quantities and General Notes <br />X <br />Details <br />X <br />Plan and Profile Sheets (40 scale) <br />X <br />Cross Sections at 100 ft interval <br />X <br />Signage & Pavement Marking Plans (40 scale) <br />X <br />Intersection Plan & Details <br />X <br />Stormwater Pollution Prevention Plans (SWPPP) <br />X <br />Computation Book <br />X <br />Construction Cost Estimate and Quantities <br />X <br />Lighting Plans <br />X <br />"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br />1. Project shall be completed as follows: <br />a. The time for completion of the 100% design drawings for the plan revisions <br />requested by the COUNTY shall be two (2) months from the date of execution <br />of this ADDENDUM. <br />2. Deliverables -The ENGINEER shall provide the COUNTY: <br />a. Three (3) 11" x 17" paper signed and sealed of the 100% plans. Also, a pdf <br />format set of the plans on a cd. <br />b. FINAL five (5) 24" x 36" paper signed and sealed "hardcopy", AutoCad <br />drawing file and PDF formats on CD. <br />c. Work Product shall be prepared and supplied in State Plane geometry (NAD83 <br />2007 adjustment if applicable); digital versions are to be prepared and <br />submitted so that the COUNTY or other consultants can readily use it for the <br />design and analysis of the area, as defined. It shall contain all information <br />necessary for third -party surveyor to independently recreate and/or utilize the <br />survey work. It is acknowledged all final products become property of Indian <br />River COUNTY and will be available for use by the public at large. <br />"SECTION V — COMPENSATION" is being modified to incorporate the following: <br />Page 2 of 5 <br />G:\LNR Support\Proposa1s\WPB\2017\SR 60 & 43rd Avenue\SR60 - 43RD AVE AMENDMENT 9 12-8- <br />17.doc <br />