My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/17/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
02/17/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:19:23 PM
Creation date
1/22/2018 10:23:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/17/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Marathon Engineering Corporation is physically working on the project jobsite excluding aesthetic, remedial, and <br />punch list work. Warranty does not include any damage from objects, or structural compromise of substrate. The <br />Customer attests that there is an effective vapor barrier installed or that the concrete in not on grade and should not <br />present a moisture problem. Warranty does not cover failure of the system due to vapor transmission. <br />5. Pricing excludes any payment or performance bonding. <br />6. Pricing includes no more than one (1) mobilization of materials and crew to job site. <br />7. This lump sum proposal is based solely on the completion of all the above areas <br />8. The flooring system is fluid applied and will follow the contour of the existing floor substrate. No "sloping" has <br />been included within this quote. Should this be required, additional charges will be applied. <br />9. Pricing is solely based on dimensions above. Due to digital files and scaling not being accurate Marathon will only <br />guarantee pricing based on our dimensions indicated in Scope of Work. Please call Marathon if you feel there are <br />any discrepancies. <br />10. Pricing is based on Marathon's standard wage rate. If prevailing wages are required additional fees will apply. <br />11. If a blended aggregate color selection is chosen, please note that it is a blend and will not be 100% uniform <br />throughout, nor is it intended to be. <br />12. Please be aware that all resinous flooring will appear slightly different from different angles if multiple sources of <br />light shine on the same area. <br />13. Marathon Engineering Corporation will produce a mock-up sample which needs to be approved by owner, <br />contractor and architect prior to ordering of materials and start of job. <br />EXPIRATION: This Contract Proposal expires sixty (60) calendar days from the date issued unless earlier <br />withdrawn or extended in writing <br />Please do not hesitate to contact me with any questions or if I can be of any assistance. I can be reached at our <br />offices at <br />Thank you once again for your consideration. <br />Regards, <br />George Hrunka <br />President & CEO, Marathon Engineering Corporation <br />142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.