My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/17/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
02/17/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:19:23 PM
Creation date
1/22/2018 10:23:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/17/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />Temporary Toilets <br />Electrical Power <br />Temporary Heat <br />ITEM <br />1 E PROVIDED <br />N X BY <br />C C OTHERS <br />COMMENTS <br />X <br />X- <br />X <br />Temporary Barricades at Entrance of Room(s) <br />Scaffolding <br />Temporary Dust Partition <br />Clean -Up Offsite <br />Clean -unto D <br />X <br />X <br />X <br />IF NEEDED <br />X <br />X <br />X <br />143 <br />uumpster rroviaea by Others <br />9 <br />Jobsite Security <br />X <br />X <br />10 <br />100% Labor & Material Payment Bond <br />X <br />11 <br />100% Performance Bond <br />X <br />12 <br />Bond Premium <br />X <br />13 <br />Payment Net 30 Days from Date of Invoice <br />X <br />14 <br />Thirty (30%) Percent Deposit at Time of <br />Contract <br />X <br />15 <br />Schedule of Values <br />X <br />16 <br />Samples & Shop Drawings and Product Data <br />X <br />17 <br />Guarantees & Warranties <br />X <br />18 <br />Installation <br />X <br />19 <br />Grind -off of existing coating systems <br />X <br />We will grind surfaces down as <br />part of the prep work. <br />20 <br />Mechanical & Electrical Rough -in <br />X <br />21 <br />Mechanical & Electrical Hook-up <br />X <br />22 <br />Refloating or Pouring Concrete or Raising <br />Existing Floors <br />X <br />Will be the responsibility of others <br />if required <br />23 <br />As Built Drawings <br />X <br />24 <br />Operation Manuals <br />X <br />25 <br />Liquidated Damages <br />X <br />26 <br />Cant cove base <br />X <br />27 <br />Any concrete repair in excess of 1/8" in diameter <br />X <br />29 <br />Waterproofing or Moisture Mitigation system <br />X <br />Only included on floor surfaces of <br />showers <br />30 <br />Any HVAC or Ventilation Work Required <br />X <br />31 <br />Any plumbing work that is required to complete <br />project or moving of any fixtures or hardware <br />X <br />32 <br />Removal of Mold & cleaning of Showers prior <br />to arrival by Marathon Engineering Corporation <br />X <br />X <br />to <br />Facility must clean showers prior <br />Marathon Engineering's arrival <br />143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.