My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 12:58:22 PM
Creation date
1/23/2018 3:41:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Conducting and Completing the Vero Beach Electric Utility <br />System Study <br />On February 9, 2015, the City executed the contract for the <br />Electric Utility System Study (Optimization Study) with PowerServices, <br />Inc., and work has begun. A copy of the PowerServices contract is <br />attached to this update report as Appendix D. As indicated in the <br />PowerServices contract, the scope of work includes several subjects or <br />task areas, including Generating Site Options, Transmission and <br />Distribution Planning, Resource Adequacy, Other Optimization <br />Strategies, and developing revisions to the City's Pole Attachment <br />Agreement, including a rate analysis. These task areas are projected <br />to be concluded between April 10 (the Generation Site Options <br />component) and November 9, 2015 (the Transmission and Distribution <br />Planning component). <br />E. Continuing Efforts to Reduce Rates <br />City Staff and their consultant, William H. Herrington, P.E., have <br />continued discussions with OUC toward refining the estimated costs and <br />details of potential power supply arrangements for Vero Beach's long- <br />term bulk power supply. Mr. Herrington works extensively in the <br />Florida bulk power supply market. Alternatives studied include (1) a <br />base case of performing the existing OUC Power Purchase Agreement <br />("PPA") as it exists; (2) canceling the existing OUC PPA and relying <br />solely on the Florida bulk power market starting on January 1, 2016; <br />(3) accepting the "discussion points" proposed by OUC to the City on <br />November 25, 2014, and (4) accepting the "discussion points" proposed <br />by OUC on October 20, 2014. <br />The most recent meeting with OUC was on February 12, 2015, in <br />Orlando. Following that meeting, Mr. Herrington prepared additional <br />analyses, which are discussed in the memorandum packet that was <br />presented to the Vero Beach City Council on Tuesday, February 17, 2015. <br />A copy of that memo packet is attached to this update report as <br />Appendix E. In summary, Mr. Herrington recommended that, considering <br />all relevant risks and uncertainties, the City should proceed to <br />negotiate a new agreement or agreements with OUC based on OUC's <br />November 25, 2014 discussion points. At its meeting on February 17, <br />2015, the City Council directed Staff to present Mr. Herrington's <br />recommendation to the City's Utility Commission and Finance Commission, <br />both of which are scheduled to meet on March 12, after which the matter <br />is expected to be addressed at the City Council meeting on March 17, <br />2015. <br />3 <br />212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.