Laserfiche WebLink
Enterprise Florida Leads <br />Provided detailed location and demographic information to Enterprise FL for the following <br />projects, as outlined in the Requests for Proposals. The EDO emails the proposals to local <br />commercial/industrial realtors requesting property information as specified in the proposals. <br />Turn -around time for responding is typically 3-5 business days. Names of the prospective <br />companies are not revealed in the RFPs. <br />• Project Blue Wave - Manufacturer (specifics not provided) considering communities in <br />Florida and outside the state. Project parameters: 20-50 acres zoned industrial, <br />constructing a 385,OOOsf facility with access to seawater, brackish water or subsurface <br />salted aquifer; 325 new jobs and a $30 million capital investment. Worked closely with <br />local property owners and/or their representatives, utilities, and county staff to submit a <br />15 -page proposal. The two sites submitted were not selected: <br />— Headwater Isles in Fellsmere — too far of a distance to available utilities <br />— Indian River Industrial Park— the property was lease -only and there was no <br />direct access to seawater <br />Project Bread — A food manufacturing and distribution firm, needing 4500-7500sf of <br />climate -controlled industrial space with 18 -foot ceiling height; anticipates 50 jobs paying <br />an average wage of $25,000/year. The company is also considering sites in Georgia <br />and South Carolina; no decision date was provided with the RFP. Submitted two <br />buildings for consideration: <br />— 6000sf warehouse at 9050 16th Place <br />— 6500sf warehouse space at 1101-1103 18th Place <br />• Project Dorothy — A construction equipment manufacturer, preferred 400,OOOsf existing <br />facility but would consider a build -to -suit; anticipates 700 jobs and a $63 million capital <br />investment. The company is also considering sites in Michigan; December 15, 2017 is <br />the decision date. The EDO submitted information on the Indian River Industrial Park. <br />Project Flicker — A manufacturer (no specifics) considering sites in Florida, needing 300- <br />500 acres for a build -to -suit facility, with an estimated $55 million capital investment; no <br />employment information was provided by Enterprise FL; January 2018 is the decision <br />timeframe. Worked closely with utilities, CareerSource, FAU and county staff to submit <br />a 23 -page proposal using the consultant's spreadsheet which outlined the required <br />information; Headwater Isles was our proposed site. <br />Project White Oak — A food manufacturer considering only existing buildings in Florida, <br />20,OOOsf to 75,OOOsf with 18 -foot ceiling heights; no employment or capital investment <br />information was included in the RFP, nor a decision date. Proposed the former Macho <br />Products building on 102nd Terrace. <br />Firearms and accessories manufacturer — Considering sites in the Southeast U.S. for <br />product distribution, adding production at a later date; project parameters: 15 jobs, <br />needing 1000-2000sf existing space; information on multiple buildings submitted. No <br />response from client as yet, per Enterprise FL. <br />