Laserfiche WebLink
EXHIBIT 1 <br />V <br />vi <br />December 11, 2017 <br />Mr. lames Gray <br />Indian River County <br />Public Works - Coastal Engineering Division <br />180127th St, Building A <br />Vero Beach, FL 32960 <br />Subject: Work Order #23 <br />Sector 5 Permitting and Construction Services <br />Indian River County, FL <br />Dear James: <br />Aptim Coastal Planning & Engineering, Inc. <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />This proposal outlines a scope of work for Aptim Coastal Planning & Engineering, Inc. (APTIM), f/k/a CB&I and <br />Coastal Planning & Engineering, Inc., to provide professional services for continued development and <br />implementation of the planned Sector 5 Beach Restoration Project, and is in addition to the services provided <br />under approved Work Order No. 12. The work is broken up into ten -(10) separate Tasks. APTIM will await the <br />County's approval before proceeding with each Task. Each cost was developed following the provisions of the <br />Professional Coastal Engineering Services Agreement (dated March 19, 2013; amended March 17, 2015) and most <br />recent Contract Renewal (dated April 11, 2017) between Indian River County and APTIM. <br />Task 1: Design Update Post -Irma <br />Task 2: Hardbottom Edge Delineation <br />Task 3: Plans and Specifications <br />Task 4: ECL Establishment <br />Task 5: Pre -Construction Biological Monitoring <br />Task 6: Pre -Construction Services <br />Task 7: During Construction Services <br />Task 8: Beach Profile Check Surveys <br />Task 9: Project Completion Services <br />Task 10: Immediate Post -Construction Biological Monitoring <br />Task 1: Design Update Post -Irma <br />Per discussion with Florida Department of Environmental Protection (FDEP), it was requested that the proposed <br />Sector 5 beach fill design be evaluated on recent conditions (post -Hurricane Irma) for the purpose of permitting <br />efforts. The proposed Sector 5 project, spanning from R-70 to R-86, was initially designed in the Feasibility <br />Evaluation utilizing the County's March 2017 winter condition survey. As part of the County's post -storm effort <br />Proj. #636232224 <br />99 <br />