My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:29:15 PM
Creation date
1/23/2018 4:00:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/19/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
',APTIM <br />Mr. James Gray <br />December 8, 2017 <br />Page 5 of 12 <br />• Items denoted on the ECL Establishment Checklist as "Contract Surveyor" are assumed to be completed and <br />submitted directly by the County's surveyor, M&E. APTIM will assist the County and M&E with review and <br />facilitation of required documents for submittal. This includes review by APTIM's Professional Surveyor and <br />Mapper of the draft MHW survey for correctness and compliance with 161.141 F.S., 177, Part II F.S., and SJ - <br />17 F.A.C. mapping requirements. APTIM's review comments will be submitted to the County and M&E within <br />10 days of receipt of the draft MHW survey. <br />• APTIM will prepare and publish a notice of the ECL workshop/hearing in a local newspaper once a week for <br />three consecutive weeks prior to the workshop/hearing. <br />• APTIM will prepare and mail public notices of the ECL workshop/hearing to all riparian owners of record of <br />upland property located within 1,000 feet of the proposed ECL. <br />• APTIM will prepare for, attend, and lead the required workshop and hearing. The ECL workshop and hearing <br />will be scheduled upon submittal of the final MHW .survey. The ECL workshop and hearing is to take place <br />within approximately 6 months of the completion of the MHW survey. APTIM will provide the required maps <br />of the MHW line for review during the ECL workshop and hearing. <br />• APTIM will transmit digital copies of all certified letter receipts, notices, and agendas to the Beaches and Mines <br />Funding Assistance Program Project Manager. <br />• APTIM will assist the County in facilitating post -ECL hearing coordination in finalizing the ECL. It is assumed <br />that M&E will provide the required Mylar copies of the final ECL survey. <br />Task 4: Schedule <br />A fixed schedule cannot be provided for this task because it is unclear when the final permits will be issued, when <br />the project can be awarded, and how the Contractor's construction schedule will be structured. APTIM will <br />attempt to execute each phase of the work in as expeditious a manner as possible. <br />Task 4: Cost <br />The lump sum cost Task 4 is $9,916.65. <br />Task 5: Pre -Construction Biological Monitoring <br />The Biological Monitoring Plan developed for the Sector S project during permitting will require pre- and post - <br />construction biological monitoring adjacent to the project area to monitor for potential secondary impacts to <br />nearshore natural hardbottom. The scope for this task is based on early coordination with FDEP and the FDEP <br />Standard Operating Procedures for Nearshore Monitoring of Beach Nourishment Projects (FDEP, 2016). The pre - <br />construction nearshore hardbottom monitoring shall include: <br />1) Hardbottom edge mapping <br />2) Installing and monitoring permanent transects <br />W01$23: Sector 5 Permitting and Construction Services Proj. #636232224 <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.