My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:29:15 PM
Creation date
1/23/2018 4:00:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/19/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,OAPTIM <br />Task 3: Deliverable <br />Mr. James Gray <br />December 8, 2017 <br />Page 4 of 12 <br />1. Draft: One (1) hardcopy and one (1) electronic copy (PDF) of the draft construction plans and specifications <br />for the County's review and comments (11"x17" for the plans and 8.5"x11",for the specifications). <br />2. Final: Two (2) hard copies and one (1) electronic copy (PDF) of the final version of the construction plans and <br />specifications (11"x17" for the plans and B.S"xll" for the specifications). <br />Task 3: Schedule <br />The draft deliverable for the work will be submitted within 30 days of receipt of the notice to proceed for this <br />task. Once the County's comments are returned to APTIM, the finalized documents addressing the comments will <br />be submitted within 14 days. <br />Task 3: Cost <br />The lump sum cost for Task 3 is $14,959.00. <br />Task 4: ECL Establishment <br />As defined in Chapter 161 of the Florida Statutes, prior to construction of the Sector 5 Beach Restoration Project, <br />an Erosion Control Line (ECL) must be established along the shoreline to define the property boundary between <br />sovereign submerged land and upland ownership. In discharging its statutory duties to establish these boundary <br />lines, coordination activities must occur with the FDEP's Division of Water Resource Management (DWRM), <br />Division of State Lands (simply referred to as State Lands) - Bureau of Survey & Mapping (BSM), Office of General <br />Counsel (OGC), local sponsors, consultants and surveyors. There are several steps to establishing an erosion <br />control line, which are described in FDEP's ECL Establishment Checklist, and included as an attachment to this <br />proposal for reference. <br />Task 4: Scooe of Work and Deliverables <br />APTIM will correspond with State Lands and the County's surveyor, Morgan & Eklund, Inc. (M&E), to facilitate <br />required submittals for the ECL filing process. A previously established ECL may exist within a portion of the <br />project area as a result of the installation of the PEP Reef. The validity of this ECL will be researched for discussion <br />and coordination with State Lands as it pertains to establishing the EClfor the Sector S Beach Restoration Project. <br />It is assumed that the County will contract directly with their local surveyor, M&E, to perform the Mean High <br />Water (MHW) survey and produce the requisite documents. No field work by APTIM is included in this task. <br />Applicable items from FDEP's ECL Establishment Checklist are described below. Work for this task primarily <br />consists of meetings, emails, and phone correspondence between APTIM, the County, M&E, FDEP and State Lands. <br />APTIM will coordinate with FDEP's Permit Manager to assure notification was given to the ECL Coordinator <br />that a new beach restoration application was submitted and that there will be a proposed ECL established. <br />• APTIM will assist the County, as needed, in preparing and enacting a local government resolution in support <br />of the proposed ECL. <br />w0#23: Sector 5 Permittingand Construction Services Proj. #636232224 <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.