My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:29:15 PM
Creation date
1/23/2018 4:00:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/19/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />, Mr. lames Gray <br />APT I �V� December 8, 2017 <br />Page 3 of 12 <br />be required as a Notice to Proceed item. The pre -construction biological monitoring survey will include an in situ <br />hardbottom edge survey that should satisfy this in -water verification. <br />Task 2: Scone of Work <br />APTIM will delineate hardbottom resources along the proposed Sector 5 project area using the 2007 and 2017 <br />aerials. Additionally, the 2015 aerial delineation will be revisited and revised in more detail along the Sector 5 <br />project area. The delineation will digitize the landward (western) edge of exposed hardbottom between R-69 and <br />R-88 (approximately 3.6 miles). The delineation will be conducted by a GIS Specialist and Marine Biologist with <br />direct experience in hardbottom delineation and characterization. The aerial analyses will be reviewed for quality <br />assurance and quality control (QA/QC) by a Senior Marine Biologist. No field work by APTIM is included in this <br />task. <br />Task 2. Deliverable <br />The final deliverables will include a map (PDF format) of the delineated and available nearshore hardbottom edges <br />overlaid on the 2017 aerials and a digital copy of the shapefiles included on a CD, flash drive, or transmitted via <br />email (whichever the County prefers). <br />Task 2: Schedule <br />The final deliverable for the work will be submitted within 30 days of receipt of the notice to proceed for this task. <br />Task 2: Cost <br />The lump sum cost for Task 2 is $10,763.00. <br />Task 3: Plans and Specifications <br />Construction plans and specifications are required as part of the JCP permit application. However, APTIM will <br />request that these be included as a Notice to Proceed item by the FDEP and United States Army Corps of Engineers <br />(USACE) so that requisite permit conditions can be incorporated directly. Thus, the plans and specifications will <br />be submitted after the Notice of Intent to Issue is received from the permitting agencies. Development of the <br />construction plans and specifications will be initiated once the County has chosen to move forward with <br />construction. The plans and specifications will be developed for the County to include in the bid package, and will <br />be submitted to FDEP and USACE in partial fulfillment of the permit application requirements. <br />Task 3: Scope of Work <br />APTIM will develop construction plans and specifications that will provide the necessary details to the Contractor <br />to construct the project, establish payment criteria, and adhere to the permit conditions. It is assumed that the <br />County will provide front-end documents, including general conditions, and provide the overall format of the <br />contract documents such that the technical specifications can be incorporated without duplication or conflict in <br />terms and conditions. <br />WO#23: Sector 5 Permitting and Construction Services Proi. #636232224 <br />101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.