My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:29:15 PM
Creation date
1/23/2018 4:00:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/19/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APTIM Mr. lames Gray <br />December. 8, 2017 <br />Page 7 of 12 <br />Task 5: Cost <br />The lump sum, cost for Task 5 is $147,,166.60. <br />Task 6: Pre -Construction Services <br />This task is to provide various services in preparation for construction of the Sector 5 Beach Restoration Project. <br />Work for this task primarily consists of email and phone correspondence between APTIM, the County, M&E, FDEP <br />and the Contractor. The County will be informed and/or copied on all pertinent correspondences. A fixed <br />schedule cannot be provided because it is unclear when the final permits will be issued, when the project can be <br />awarded, and how the Contractor's construction schedule will be structured. APTIM will attempt to execute each <br />phase of the work in as expeditious a manner as possible. <br />Task 6: Scope of Work <br />• Bid Development, Solicitation, and Awarding: In conjunction with the construction plans and specifications, <br />front-end documents are developed to assist bid solicitation and award. These documents outline contractual <br />obligations, and define the responsible parties and their roles. It is assumed that the County will provide their <br />front-end documents for inclusion into the bid package as in past projects. APTIM will assist the County with <br />the solicitation and award of the project. APTIM will prepare for and attend a pre-bid meeting to describe the <br />project and answer questions for potential bidders. APTIM will respond to questions submitted by potential <br />bidders via an addendum. APTIM will review the bids for completeness; assess the capability of the bidder to <br />complete the work in a timely fashion; assess the capability of the bidder to perform the work within their bid <br />amount; and assess the capability of the bidder to perform the work in compliance with permit conditions <br />and plans and specifications. Following this review, APTIM will provide the County a letter of <br />recommendation, via email, as to whether the low bidder is sufficiently responsive and capable to perform <br />the work as required. This letter will be provided within 5 days of the bid submittals. <br />• Pre -Construction Submittals: The permit conditions and specifications require that the Contractor submit <br />various items for review and approval prior to construction. APTIM will review these submittals for <br />completeness. Correspondence regarding the pre -construction submittals will be via phone and email. The <br />County will be informed and/or copied on correspondences regarding pre -construction submittals. <br />• Pre -Construction Meeting: APTIM will prepare for, attend, and lead a pre -construction meeting with the <br />permitting agencies and the Contractor. Following the meeting with the permitting agencies, the County, <br />APTIM and the Contractor will meet to discuss other aspects of the project. APTIM will take notes from the <br />meetings and distribute draft meeting minutes via email within 10 days of the meeting. If comments are <br />received, the meeting minutes will be revised and redistributed via email. <br />• Pre -Construction Design Update: The Contractor will be required to conduct and submit a pre -construction <br />survey of the project area. APTIM will review this data for accuracy, overlay the bid template on the updated <br />survey data, and calculate the fill volume. The updated fill volume will differ from the bid volume due to <br />inclusion of more closely spaced lines and natural changes in the beach profile since the design survey. APTIM <br />WO#23: Sector 5 Permitting and Construction Services Proi. #636232224 <br />105 <br />