My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:29:15 PM
Creation date
1/23/2018 4:00:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/19/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,a APTIM <br />Mr. James Gray <br />December 8, 2017 <br />Page 8 of 12 <br />will discuss the updated fill volume with the County and revise the construction template to meet the County's <br />budget and align with permit conditions. A revised template for each pay profile will be provided to the <br />Contractor via email. The County will be copied on correspondence regarding the design update. <br />Task 6: Cost <br />The lump sum cost for Task 6 is $15,187.65. <br />Task 7: During Construction Services <br />This task is to provide various services during construction of the Sector 5 Beach Restoration Project. Work for <br />this task primarily consists of email and phone correspondence between APTIM, the County, FDEP and the <br />Contractor. The County will be informed and/or copied on all pertinent correspondences. <br />Task 7: Scone of Work and Deliverables <br />• Weekly Construction Progress Meetings and Site Observations: APTIM will coordinate and conduct weekly <br />construction progress meetings with the County and Contractor. APTIM will direct the meeting, coveringwork <br />progress and schedule, conformance to plans and specifications, and other relevant issues that need to be <br />addressed. APTIM will distribute draft meeting minutes via email within S days of the meeting. If comments <br />are received, the meeting minutes will be redistributed via email. The Engineer of Record (EOR) for the project <br />will attend and conduct these weekly meetings. If the EOR is unable to attend, another Professional Engineer <br />registered in the State in the State of FL will attend and conduct the meeting. The Sr. Project Manager or his <br />designee will also be available to attend meetings as needed up to a total of four (4) meetings. Prior to each <br />meeting, APTIM will conduct a site visit to observe areas under active construction, staging areas, and access <br />points. Recently completed beach sections will be observed for general conformance with the plans and <br />specifications. Representative sand samples will be collected within recently completed beach sections. <br />These samples will be visually analyzed for general conformance with the permit conditions, and stored for <br />up to one year. Up to ten (10) samples will be analyzed in APTIM's geotechnical laboratory for grain size, silt <br />content, carbonate content, and Munsell color to ensure conformance of the fill material with permit <br />conditions. The proposed budget for this task accounts for up to twenty (20) construction progress meetings <br />and site observations. All travel costs are based from the Boca Raton office. <br />• Construction Administration: <br />o APTIM will make determinations on non -conforming and unauthorized work as described in the <br />project plans and specifications. <br />o APTIM will assist the County to prepare field changes or change orders to be executed by the <br />Contractor, recommended for approval by APTIM and agreed to by the County. These documents will <br />be submitted electronically via email unless they must be sealed, at which point a hard copy will be <br />provided along with an electronic copy at the time of issuance. This scope of work is based on the <br />assumption that there will be up to three (3) change orders and two (2) field adjustments. <br />WO#23: Sector 5 Permitting and Construction Services Proj. #636232224 <br />106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.