Mr. James Gray <br />AAPTIM December 8, 2017 <br />Page 10 of 12 <br />APTIM will provide the County with cross-sections showing APTIM's survey, the design template, and, as available <br />at the time of the deliverable, the Contractor's pre and post -construction profiles. This information will be <br />provided electronically via email. <br />Task 8: Schedule <br />The final deliverable for the work will be submitted within 7 days of the collection of the survey. <br />Task 8: Cost <br />The lump sum cost for Task 8 is $7,904.65. <br />Task 9: Project Completion Services <br />This task is to provide various services near the completion and immediately following construction of the Sector <br />5 Beach Restoration Project. <br />Task 9: Scope of Work and Deliverables <br />• Substantial Completion and Final Walkthrough: APTIM will conduct one substantial completion walkthrough <br />with the County and Contractor following beach fill placement. APTIM will assist the County in the preparation <br />of a punch list of items to be completed by the Contractor prior to .final acceptance. APTIM will conduct a <br />final walkthrough with the County following site restoration, installation of dune vegetation, completion of <br />punch list items, and demobilization. Upon completion of the project, APTIM will provide recommendations <br />concerning final payment to the Contractor and release of any retained percentage. The Engineer of Record <br />will attend both walkthroughs. <br />• Post -Construction Project Report and Certification: Upon completion of the project, a Post -Construction <br />Project Report will be prepared and submitted to the County. The report will include project personnel, <br />construction methodology, significant construction milestone dates, sediment sample gradation analyses, <br />construction quantities, construction costs, construction deviations and change orders, and beach profiles <br />cross-sections showing pre -construction and final as -built transects. The Post -Construction Project Report <br />will be submitted to the County within thirty (30) days of receiving the post -construction beach profile survey <br />data. APTIM will also facilitate the preparation and submittal of requisite project completion certification <br />letters and/or as -built drawings to the permitting agencies. <br />Task 9: Schedule <br />A fixed schedule cannot be provided because it is unclear when the final permits will be issued, when the project <br />can be awarded, and how the Contractor's construction schedule will be structured. APTIM will attempt to <br />execute each phase of the work in as expeditious a manner as possible. <br />Task 9: Cost <br />The lump sum cost for Task 9 is $11,942.30. <br />WO#23: Sector S Permitting and Construction Services Proj. #636232224 <br />108 <br />