My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/09/2018
CBCC
>
Meetings
>
2010's
>
2018
>
01/09/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:11:23 PM
Creation date
1/29/2018 11:05:32 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/09/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Preliminary Site Plan will be supported by a Sewage Lift Station Report containing computations for sizing <br />the selected pumps adequate to handle the peak flows expected from the project. <br />The Preliminary Site Plan will include a Landscape Plan meeting Indian River County's code. The Landscape <br />Plans, we anticipate will be prepared by our landscape sub -consultant, Sartain & Associates. <br />The Preliminary Site Plan will include the locations for site lighting poles for the new College field and new <br />softball field. The design of the site lighting facilities including signed and sealed structural designs for the <br />poles and lighting contours, we anticipate will be provided by the lighting equipment vendor at no cost to <br />the County. We will, however, utilize the services of our electrical sub -consultant to provide the designs for <br />extension of power to the new lighting facilities. (No additional site lighting fixtures are proposed for the <br />grass parking areas to the north of the College level field. It is understood the College level field lighting will <br />provide sufficient spillover.) <br />The Preliminary Site Plan will include the location for properly sized concrete pads to support bleachers. The <br />structural design of the concrete slabs will be designed by our structural sub -consultant, ML Engineering. <br />(The bleachers we understand will be provided by the County. The design of the bleachers is not included in <br />our scope and/or fees.) <br />Permitting / Construction Plans: <br />The Preliminary Site Plan designs shall be submitted to the County for review and comment and shall also be <br />used for acquisition of approvals / permits for the project. We shall make reasonable revisions to the <br />Preliminary Site Plan design to address comments from the County and permitting agencies. <br />We shall make application for approvals / permits for this project as follows: <br />Indian River County Site Plan Approval <br />Indian River County Land Clearing Permit <br />Indian River County Tree Removal Permit <br />Indian River County Type B Stormwater Permit <br />Indian River County Utilities Permit <br />Indian River County Right -of Way Permit (Driveway & Water/ Wastewater) <br />Department of Health Onsite Sewage Disposal System Abandonment Permit <br />St. Johns River WMD Environmental Resource Permit <br />Florida DEP Water General Permit <br />Florida DEP Wastewater Permit <br />Indian River Farms WCD Drainage Connection Permit (if Required) <br />It is anticipated the addition of one (1) little league field to the site will not result in a need for a Traffic Impact <br />Analysis for this project. <br />We shall address reasonable comments received from approval / permitting agencies regarding our designs. <br />Once the comments have been addressed and all approvals / permits issued, the plans shall be considered <br />Final Site Plans. We shall provide sets stamped "Bid Sets" as outlined under the Deliverables section of this <br />proposal. <br />Our Proposal fees do not include addressing environmental comments pertaining to wetlands and/or <br />threatened and endangered species issues. It is understood these environmental services, if needed, will be <br />provided by the County Environmental Staff. <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.