My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-022
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:57:43 AM
Creation date
2/7/2018 10:37:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/06/2018
Control Number
2018-022
Agenda Item Number
8.E.
Entity Name
Masteller & Moler, Inc.
Subject
Drainage improvement Project
Area
Victor Hart, Sr. Complex
Project Number
1760
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Project No. 1760 <br />VICTOR HART SR. COMPLEX DRAINAGE IMPROVEMENTS —Work Order No. 4 MM File#1755 <br />Page 3 of 4 <br />The selected Contractor for the project shall be responsible for acquiring and adhering to an NPDES Soil <br />Erosion and Sediment Control permit. <br />Items to Be Provided By Client: <br />To support our design and permitting services on this project, it is understood the County will provide the <br />following information: <br />1. Boundary & Topographic Survey in Autocadd with topographic survey information on <br />NAVD'88 datum; <br />2. Soils Report (if needed to support our designs). <br />Any and all items not specifically set forth in this Work Order are excluded. Specifically excluded items <br />include but are not limited to: land surveying, soils investigations, field lighting designs, application fees, <br />treatment and attenuation computations; and construction services. <br />SECTION III -TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />Preliminary Design (after B&T Receipt) 20 Working Days <br />Final Design (after Client Comments Receipt) 15 Working Days <br />Permitting 30 Working Days <br />2. Deliverables—The ENGINEER shall provide the COUNTY: <br />a. Preliminary Construction Plans 2 Sets <br />b. Final Construction Plans 10 Sets <br />c. Permit Application Forms As Required <br />d. Related digital AutoCAD and PDF files <br />SECTION IV - COMPENSATION <br />The COUNTY agrees to pay, and the ENGINEER agrees to accept a maximum not -to -exceed amount of <br />$26,820.00 for the above-described services rendered as identified in Sections I and II of this Work Order <br />No. 4 based on the following: <br />Meetings <br />$ <br />700.00 <br />Research <br />$ <br />1,760.00 <br />Site Visits <br />$ <br />2,820.00 <br />Design <br />$ <br />10,620.00 <br />Comments <br />$ <br />2,360.00 <br />Final Design <br />$ <br />4,600.00 <br />Permitting <br />$ <br />3,660.00 <br />Reimbursables (not to exceed) <br />$ <br />300.00 <br />Total Maximum Amount Not -To -Exceed <br />$ <br />26,820.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.