Laserfiche WebLink
IRC Project No. 1760 <br />VICTOR HART SR. COMPLEX DRAINAGE IMPROVEMENTS —Work Order No. 4 MM File#1755 <br />Page 2 of 4 <br />will be designed to discharge into the existing ditch system along the west side of the site subject to its <br />being confirmed to being onsite. Said ditch flows north and discharges into Indian River Farms WMD Sub - <br />lateral H-2. It is expected the stormwater system will not be designed to flow to the existing wet detention <br />system. The football field and unpaved parking areas will be designed to be filled, stabilized, final graded, <br />and sodded in a manner to eliminate standing water. <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between ENGINEER and the COUNTY, the ENGINEER shall provide Professional <br />Engineering services to complete all tasks as outlined in this Work Order No. 4 as follows: <br />Preliminary Design: Following receipt of a Boundary & Topographic Survey of the site to be provided by <br />County, we shall develop preliminary engineering designs for the project. The Preliminary Designs will <br />depict both horizontal and vertical information for the proposed site work improvements. The <br />Preliminary Design will depict proposed grading to improve the drainage on and adjacent to the existing <br />football field and it's supporting unpaved parking as well as a conveyance system. The storm conveyance <br />system will be designed to flow to the existing drainage ditch running parallel with the west property <br />which ditch flows north to IRFWCD Sub -lateral H-2. <br />The Preliminary Design will be supported by conveyance system computations only. As the project will <br />involve modifying existing grading to existing facilities and as no new impervious surface improvements <br />are planned with this project, it is expected no new treatment and/or attenuation facilities will be needed <br />to support this project. It is understood our design shall include raising the existing football field grades <br />to assure proper positive drainage. <br />Final Design: The Preliminary Designs shall be submitted to County Staff for review and comment. We <br />shall make reasonable revisions to the Preliminary Design to address comments. Once the preliminary <br />design comments have been addressed, the plans shall be advanced to Final Design suitable for <br />permitting. <br />Permitting: We shall make application for approvals / permits for this project as follows: <br />Indian River County Land Clearing Permit <br />Indian River County Tree Removal Permit (if Required) <br />Indian River County Type A Stormwater Permit Modification <br />St. Johns River WMD Environmental Resource Permit Modification <br />It is our goal to have the project received by the SJRWMD in a manner that will allow for either a "No <br />Permit Required" or "Permit Exemption" issuance if possible. <br />We shall address reasonable comments received from approval / permitting agencies regarding our <br />designs. Our Proposal fees do not include addressing environmental comments pertaining to wetlands <br />and/or threatened and endangered species issues. It is understood these environmental services if <br />needed will be provided by the County Environmental Staff. <br />Once the Final Plans have been accepted and all permits are in hand for this project, we shall provide <br />plans stamped "Bid Set" for the County's use in bidding the proposed work. <br />