My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI <br />DOCKET NO. 20180001 -El <br />PAGE 29 <br />ATTACHMENT A <br />Table 17-4 <br />TECO 2018 GPIF Targets/Ranges for the period January -December, 2018 <br />GPIF Targets / Ranges for the <br />period January 2018 throw h December 2018 <br />Target <br />EAF <br />(%) <br />Maximum <br />Target <br />Maximum <br />EAF Savings <br />(%) ($000's) <br />ANOHR <br />BTU/KWH <br />ANOHR Savings <br />BTU/KWH ($000's) <br />Big Bend 2 61.5 <br />68.2 615.6 <br />11,320 <br />11,798 778.3 <br />Big Bend 3 66.7 <br />72.4 1,079.4 <br />10,619 <br />10,987 1,448.4 <br />Big Bend 4 78.7 <br />82.0 1,473.1 <br />10,448 <br />10,830 2,146.5 <br />Polk 1 74.4 <br />77.0 211.9 <br />9,978 <br />10,312 1,028.0 <br />TECO <br />Polk 2 83.2 <br />85.7 1,408.9 <br />7,382 <br />7,936 13,242.8 <br />Bayside 1 82.5 <br />83.8 770.2 <br />7,489 <br />7,619 1,359.6 <br />Bayside 2 1 77.3 <br />79.1 1,505.7 <br />7,676 <br />7,905 2,106.5 <br />Total 7,064.8 <br />22,110.1 <br />Source: GPIF Target and Range Summary, Page 4 of 40 (Exhibit BSB -2, Document 1) <br />ISSUE 18: What are the appropriate projected net fuel and purchased power cost <br />recovery and Generating Performance Incentive amounts to be included in <br />the recovery factor for the period January 2018 through December 2018? <br />STIPULATION: <br />The appropriate projected total fuel and purchased power cost recovery amounts <br />for the period January 2018 through December 2018 are as follows: <br />DEF: On August 29, 2017, <br />Duke Energy Florida, <br />Second Revised and <br />RRSSA Petition). <br />Docket Number 20170183 -EI was opened to address the <br />LLC Petition for Limited Proceeding to Approve 2017 <br />Restated Stipulation and Settlement Agreement (2017 <br />If the 2017 RRSSA Petition is approved, the appropriate projected net fuel and <br />purchased power cost recovery and Generating Performance Incentive amounts to <br />be included in the recovery factor for the period January 2018 through December <br />2018 is $1,598,120,482. <br />If the 2017 RRSSA Petition is not approved, the appropriate projected net fuel <br />and purchased power cost recovery and Generating Performance Incentive <br />amounts to be included in the recovery factor for the period January 2018 through <br />December 2018 is $1,695,942,751. <br />FPL: The appropriate projected total fuel and purchased power cost recovery amounts <br />for the period January 2018 through December 2018 is $2,874,984,279, including <br />
The URL can be used to link to this page
Your browser does not support the video tag.