My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -EI <br />PAGE 30 <br />prior period true -ups, revenue taxes, FPL's portion of Incentive Mechanism gains, <br />and the GPIF reward. <br />FPUC: The appropriate projected total fuel and purchased power cost recovery amounts <br />for the period January 2018 through December 2018 is $62,183,113, which <br />includes prior period true up amounts. <br />GULF: The appropriate projected total fuel and purchased power cost recovery amounts <br />for the period January 2018 through December 2018 is $413,276,870, including <br />prior period true up amounts and revenue taxes. <br />TECO: The appropriate projected total fuel and purchased power cost recovery amounts <br />for the period January 2018 through December 2018 is $627,802,929, which is <br />adjusted by the jurisdictional separation factor. The amount is $611,208,904 when <br />the GPIF reward or penalty, the revenue tax factor, and the prior period true up <br />amounts are applied. <br />ISSUE 19: What is the appropriate revenue tax factor to be applied in calculating each <br />investor-owned electric utility's levelized fuel factor for the projection period <br />January 2018 through December 2018? <br />STIPULATION: <br />The appropriate revenue tax factor to be applied in calculating each investor- <br />owned electric utility's levelized fuel factor for the projection period January <br />2018 through December 2018 is 1.00072. <br />ISSUE 20: What are the appropriate levelized fuel cost recovery factors for the period <br />January 2018 through December 2018? <br />STIPULATION: <br />The appropriate levelized fuel cost recovery factors for the period January 2018 <br />through December 2018 are as follows: <br />DEF: On August 29, 2017, Docket Number 20170183 -EI was opened to address the <br />Duke Energy Florida, LLC Petition for Limited Proceeding to Approve 2017 <br />Second Revised and Restated Stipulation and Settlement Agreement (2017 <br />RRSSA Petition). <br />If the 2017 RRSSA Petition is approved, the appropriate levelized fuel cost <br />recovery factors for the period January 2018 through December 2018 is 4.127 <br />cents per kWh (adjusted for jurisdictional losses). <br />
The URL can be used to link to this page
Your browser does not support the video tag.