My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-029C
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-029C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:18:39 PM
Creation date
2/20/2018 1:18:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2018
Control Number
2018-029C
Agenda Item Number
8.G.
Entity Name
REI Engineers
Subject
Sebastian Corners Roof Replacement
Project Number
1765
Alternate Name
Work Order No. 4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REI Proposal No. P17TPA-031 Revision 1 <br />November 22, 2017 <br />Page 2 <br />EXHIBIT "A" <br />E. Prepare technical specifications of the removal or other preparation of the existing roofing <br />system(s) and installation of the insulation, roof system(s) and sheet metal for the building. <br />F. Issue preliminary Contract Documents for Owner review. Upon acceptance, final Contract <br />Documents will be prepared and submitted. <br />G. Provide advertisement for bids to Owner for use in advertising in accordance with <br />applicable laws and/or submit names of three or more qualified Contractors to bid the <br />Contract Documents. <br />H. Hold one Pre -Bid Meeting for potential contractors to review the Contract Documents and <br />resolve any questions that may arise during the bid stage of the project. <br />I. Bids shall be analyzed and a recommendation made based on low bid, alternates, <br />contractor's past performance and Owner's budget restrictions. Submit a certified Bid <br />Tabulation and recommendation for award. <br />II. CONSTRUCTION ADMINISTRATION <br />A. Complete Owner's recommended Form of Agreement between Owner and Contractor and <br />submit to Owner and Contractor for acceptance. <br />B. Issue "Notice to Proceed" with Date of Commencement and construction period <br />established. <br />C. Review and accept, as appropriate, shop drawings and submittals as required by the <br />Contract Documents. Return unacceptable submittals to contractor as required until <br />compliance with specifications is realized. <br />D. Hold a pre -construction meeting with the successful contractor to ensure a clear <br />understanding of the plans and specifications. <br />E. Perform quality assurance site visit once every five working days, Monday through Friday, <br />to verify work is in compliance with the Contract Documents. Photographs will be taken <br />as deemed necessary for documentation. REI cannot comment on work that takes place <br />and covered while REI is not onsite. <br />F. Prepare and submit reports from each quality assurance site visit relaying information <br />pertaining to weather, area worked, application methods, material types installed during <br />the site visit, and listing of non -conforming items requiring Contractor's correction. <br />G. Certify Contractor's monthly invoicing based on status of work performed as determined <br />from project site visits. <br />H. Route any change orders developed to address changes to the contract requirements. <br />I. Upon notification by the contractor that the job is substantially complete, a substantial <br />completion inspection will be conducted with REI, Owner, Contractor and Manufacturer <br />personnel. A punch list will be prepared to list any minor items that require further <br />treatment. <br />re -i Zt] <br />E <br />NGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.