My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-036
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:31:14 PM
Creation date
2/23/2018 4:16:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/20/2018
Control Number
2018-036
Agenda Item Number
8.P.
Entity Name
Coastal Technology Corporation
Subject
Sector 7 Beach and Dune Restoration Project
Design and Permitting Services
Area
Porpoise Point
Project Number
Work Order No. 2018007-1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Work Order Number 2018007-1 <br />Sector 7 Beach and Dune Restoration Project Exhibit 1 - Scope of Work <br />Task 3 — Prequalification of Upland Sand Sources <br />FDEP is expected to require identification of details regarding the potential upland sand <br />sources for FDEP assessment prior to FDEP issuance of a permit for Project construction. In <br />general, CONSULTANT will assist the COUNTY with a solicitation to prequalify acceptable and <br />potential upland sand sources to be identified in the permit applications. <br />CONSULTANT will develop minimum "Geotechnical Standards" for beach fill based upon the <br />Geotechnical Standards & Requirements included in the COUNTY's initial Sector 3 Project — <br />updated to reflect: <br />• existing governing statutes (161 F.S.) and rules (6213-33 & 6213-41 F.A.C.), <br />• the results of the pre -application meeting held with FDEP under Task 1, <br />• the expected equilibrated profile of sand fill and associated impacts upon hardbottom, <br />• compatibility with native beach material characteristics based upon: mean grain size, <br />percent fines, sorting, percent carbonate, and Munsell color (wet/dry). <br />CONSULTANT will develop "Geotechnical Requirements" for documentation of potential <br />upland sand sources — to be provided by potential upland sand suppliers; such requirements <br />are expected to include: <br />• documentation of compliance with the updated Geotechnical Standards, <br />• representative samples of the sand fill proposed to be provided, and <br />• as available: <br />o a topographic survey of the upland sand source site; <br />c a sufficient number of core borings to define the sub -surface stratigraphy; <br />o sediment characteristics for each in-situ sediment layer including: <br />(a) grain size distribution, <br />(b) percent carbonate, <br />(c) percent silt, and <br />(d) Munsell color (wet/dry); <br />o sediment characteristics of proposed processed sand material with a description <br />of the processing methods; <br />o an assay of the above - signed and sealed by a Professional Geologist or Engineer; <br />the quantity of sand available and capacity of the mine to produce suitable sand, and <br />additional information as may be requested by FDEP at the pre -application meeting. <br />The COUNTY will prepare a Draft Solicitation for prospective suppliers to provide sand for <br />nourishment of COUNTY beaches; the Draft Solicitation shall include COUNTY requirements <br />associated with operation of a sand -mine and/or sand -hauling within County limits, including <br />the Geotechnical Standards and Geotechnical Requirements described above. <br />The COUNTY will provide the Draft Solicitation to CONSULTANT and meet with CONSULTANT <br />to review and finalize the Solicitation; the COUNTY will incorporate revisions as warranted. <br />The COUNTY shall publish the Solicitation, address questions of prospective suppliers, and <br />receive responses from potential suppliers. The COUNTY shall provide copies of all responses <br />to CONSULTANT, who will assess the proposed sand sources, and recommend sand source <br />suppliers to be pre -qualified for use in construction of the Project. The COUNTY will notify the <br />prospective sand source suppliers of the Solicitation results. CONSULTANT will prepare a <br />written summary of the above as an Appendix for the Task 5 - Preliminary Design Document. <br />Page 2 of 5 <br />February 9, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.